Laserfiche WebLink
D PROGRAM CONSOLIDATED FO <br /> UNDERGROUND STORAGE TANK <br /> CERTIFICATION OF INSTALLATION / MODIFICATION <br /> (One form per project) <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) i <br /> BUSINESS NAME(Same as Facility Name or DBA—Doing Business As) 3 <br /> SAN JC) IA-) C.Dv Ate' 6c ,4-;a9(-- <br /> BUSINESS SITE ADDRESS 103. CITY 104. <br /> ) UJ �� C <br /> U. INSTALLATION /MODIFICATION PROJECT DESCRIPTION <br /> TYPE OF PROJECT(Check all that apply) 483a. WORK AUTHORIZED UNDER PERMIT 483b. <br /> ❑ 1.TANK INSTALLATION OR REPLACEMENT (Number or Date): <br /> ❑ 2.PIPING INSTALLATION OR REPLACEMENT <br /> ❑ 3.SUMP INSTALLATION OR REPLACEMENT /*)o J <br /> ?1[^� <br /> ❑ 4.UNDER DISPENSER CONTAINMENT INSTALLATION OR REPLACEMENT l <br /> [1 5. <br /> DESCRIPTION OF WORK BEING CERTIFIED: 483c. <br /> WHILE CONDUCTING A SCHEDULED TRI-ANNUAL SB 989 SECONDARY <br /> CONTINMENT TESTING OF THE UNDERGROUND STORAGE TANK SYSTEM IT WAS <br /> NOTED THAT A SECONDARY CONTAINMENT PIPE FOR THE PRIMARY TURBINE <br /> SUPPLY LINE WAS CRACKED. THE CRACK EXTENDED FORM INSIDE THE SUMP TO <br /> APPROXIMATELY 4 INCHES OUTSIDE THE SUMP. FURTHER INVESTIGATION <br /> REVEALED THAT A SECONDARY CONTAINMENT PIPE FOR THE PRIMARY TURBINE <br /> RETURN LINE WAS ALSO CRACKED IN AN ALMOST IDENTICAL MANNER. <br /> REPAIRS WERE MADE AND ALL APPROPRIATE TESTING WAS CONDUCTED AND <br /> THE SYSTEM WAS RETURNED TO NORMAL OPERATIONS. <br /> III. CONTRACTOR INFORMATION <br /> NAME OF CONTRACTOR WHO PERFORMED INSTALLATION/MODIFICATION 482a. <br /> CONTRACTOR LICENSE# ' ICC CERTIFICATION# 4szo. <br /> 7-7q S'D 6A P <br /> IV. CERTIFICATION <br /> I certify that the information provided herein is true,accurate,and that the following conditions have been satisfied: <br /> • The installer has met the requirements set forth in 23 CCR§2715,subdivisions(g)and(h). <br /> • The underground storage tank, any primary piping, and any secondary containment was installed according to applicable <br /> voluntary consensus standards and any manufacturer's written installation instructions. <br /> • All work listed in the manufacturer's installation checklist has been completed. <br /> • The installation has been inspected and approved by the local agency, or if required by the local agency, inspected and certified <br /> by aregistered professional en ' eer having education and a 'ence with ural and storage tanksystem installations. <br /> SIGNATYRE OF TANK OWNER OR OWNER'S AGENT DATE 494- PHONE 487. <br /> '4� &�� 495 <br /> RTIFIER'S NAME(print) " CERTIFIER'S TITLE: 48e. <br /> J 455:5�if yM Env ''cf M <br /> NAME OF CERTIFIER'S EMPLOYER(DBA) . CERTIFIER'S RELATIONSHIP TO TANK OWNER 499. <br /> j t �Qn ❑ 1.TANK OWNER ❑ 2.TANK OPERATOR <br /> A.J�6:S [(3.CONTRACTOR ❑ 4.PROPERTY OWNER <br /> 1 ❑ <br /> 5.OTHER AUTHORIZED AGENT OF TANK OWNER <br />