Laserfiche WebLink
NEW UST INSTALLATION INSPECTION RECORD <br />FACILITY NAME: wmce14: _ <br />FACILITY ID# TANKS S ULA TANK MGDEL/MATERIAL• �i �✓� <br />CAPACITY: PRODUCT: R.e.H.S: 7' i <br />INITIAL INSPECTIONS <br />ti' ( 3. <br />A <br />1 <br />(cat 2636 (a)) <br />VACUUM:. p, SOAP: PSI: HRS/MIH: <br />P <br />N <br />ALL TANKS TO SE INSTALLED AND 7E5TED IN ACCORDANCE <br />HRS/MIN: <br />p <br />( <br />WITH MANUFACTURER WRITTEN SPECIFICATIONS <br />R <br />T <br />tCat 2636 (b)) <br />0 <br />I <br /><COt 2636 (c)(1)) <br />V <br />A <br />18. OVERFILL PROTECTION INSTALLED/ (CCR 2635 (b) (23) <br />E <br />L <br />19. TANK ACCESS PMTS SRWGHT TO =ADE (L==ED AND WATERTIGHT) API <br />0 <br />S <br />I20. TANK INTEGRITY TEST (PASSING HARD COPT) CCCR 2635 (a) (5)) <br />ITEM OR EQUIPMENT INSPECTED <br />OATS <br />I22. <br />"C" FMH CMPLETED AND SUBMITTED (CCD Z&-15 (d)) <br />I23. <br />MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED lCCR 2630-2636) <br />1. UST PLANS SUBMITTED/ FEES PAID (H;S CCOE 25287) <br />I 124. <br />ALL C=ITIONS MET; FACILITY PS MIT ISSUED CH+S C*..f3E 25284) <br />2. UST INSTALLATION PLANS APPROVED <br />INITIAL INSPECTIONS <br />ti' ( 3. <br />INSPECTION AND TEST OF SECONDARY CONTAINMENT: <br />HOLIDAY: f <br />(cat 2636 (a)) <br />VACUUM:. p, SOAP: PSI: HRS/MIH: <br />3RINE(LIQUI2 ANNULAR): OTHER: <br />MI 4. <br />PRIMARY TANK TEST: PSI: <br />HRS/MIN: <br />I 15. <br />TANK APPROPRIATELY PLACED WITH APPROVED 3ACXFILL <br />CAPI/PEI) <br />PIPING (NSPSCTIWIS <br />FINAL INSPECTION <br />6. <br />PRIMARY PIPING TEST (MINIMIM 44 Ps1/30 MIN) <br />(cat 2636 (a)) <br />I 17. <br />I( 18• <br />I19. <br />SECONDARY PIPING CONTAIM04ENT TEST PSI: HRS/HIN: OTHER: <br />LAKE TEST ON ALL SUMPS (24 HR. MINI") HRS. <br />UNUSED TANK INCAS SEALED ADD CORROSION PROTECTED <br />(C=t 2636 (e)) <br />(= 2635 (a) (4)) <br />PEI <br />(10. <br />OVERSPILL PERFORMANCE TEST <br /><CC2 2635 (b) (1) (C)) <br />II I11. <br />ALL PIPING AND FITTINGS CORROSION PROTcCTED <br />tCat 2636 (b)) <br />I12. <br />PIPING SLOPES TO COLLECTION SUMP <br /><COt 2636 (c)(1)) <br />FINAL INSPECTION <br />CO MENTS: <br />E1123406 9/95 7 <br />I <br />I <br />(13. PERFORMANCE TEST FOR "ALL" MONITORING PRIES CCCR 2632 (c) (2)) <br />I14. <br />PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) <CCt 2632 (c) (2)) <br />I <br />I15. PERFORMANCE TEST OF LINE LEAK DETECTION (Cu^t 2643 (c) <1)) <br />16. PERFORMANCE TEST OF AUTC14ATIC PUMP SYS70 SHUT-OFF CCCit 2636 (9)) <br />I17. <br />SALL FLOAT VALVES INSTALLED <br />18. OVERFILL PROTECTION INSTALLED/ (CCR 2635 (b) (23) <br />( <br />19. TANK ACCESS PMTS SRWGHT TO =ADE (L==ED AND WATERTIGHT) API <br />jI <br />i <br />( <br />I20. TANK INTEGRITY TEST (PASSING HARD COPT) CCCR 2635 (a) (5)) <br />IZi. MONITORING PLAN, RESPONSE PLAN AND LOG 3013K ON SITE CCS Z63Z (d)) <br />I22. <br />"C" FMH CMPLETED AND SUBMITTED (CCD Z&-15 (d)) <br />I23. <br />MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED lCCR 2630-2636) <br />I 124. <br />ALL C=ITIONS MET; FACILITY PS MIT ISSUED CH+S C*..f3E 25284) <br />CO MENTS: <br />E1123406 9/95 7 <br />