Laserfiche WebLink
OLASTEEL 16'" BED AND BACKP i LL <br />ALL QXCAV^TlO NATIVE SOIL MUST 8E REPLACED WITH APPROVgD SACXPI1LL. 00 <br />NOT BACKFILL IN 6AYERS USING DIPPERENT MATERIALS. <br />APPROVSO BACKPILL MAT*RIALS ARM: <br />1. CLSAN WASHED LAND <br />2. ORAVEL <br />A CLEAN. NATURALLY ROUNDED AOOREOATB WITH A MIX OP PARTICLE 3IZ53 N01 <br />LESS THAN 1/6• NOR MORS THAN 3/4' 13 REQUIRED. THIS MATERIA. 13 <br />COMMONLY CALLED PEA GRAVEL. <br />3. STONE OR *RAVEL CRUSHING$ <br />WASHED STONE OR GRAVEL CRUSHING$ WITH ANGULAR PARTICLE SIZE NOT L93S <br />THAN 1/111" NOR MORN THAN 1/2' IB REQUIRED. <br />T` ST PROCEOURg FOR JACKgTHO TANKS AT JO$SI TE WMILg TANK I$ <br />EMPTY: <br />1. 1R OUTSR TANK MAINTAINS AT LEAST 3.3 IN. NO. OF VACUUM FOR Oka HOUR <br />BOTH rN9 INNER -TANK AND OVTIZR TANK MAY BE CONSIDERED PROPBRLY <br />TBOTSD. <br />2. INTERSITIAL SPACE TO B! VACUUM TESTED ONLY. <br />NOTS: w MODERN WIELDING COMPANY DOES NOT RECOMMEND HO` 1 DAY TESTING POR! <br />OLASTEEL 11 TANKS. <br />HANDL <br />..- r .:. ... ARESUPPLIED WITH ZITHER ONE-OONE-OR TWO INSTALLED LlPITIN10 <br />c DaPONOGHT ON TANK 5122. ROPER TO SPECIFIC TANK DRAWING TO 06-TERMINE <br />NUMBER ?z POR APPLICATION OF LIFTING LUG COVERS TO'*QLAO <br />_T226 o TANKW PR 1014 TC <br />SACKPILLING OR COVERING THE, TANK. <br />00 NOT DROPIOR MOLL TANKM FROM TRUCK INTO EXCAVATED OPENING, <br />LIFTINO PROCEDURES:+ <br />0® AAX I11LIA <br />SECONDARY TANK Q®® M I N I AUA <br />r------------------ -----I <br />1 <br />I"�#' PR i AARY TANK 1 <br />t 1 <br />t t <br />I ' ' <br />THESE INSTALLATION IN5TRU4;?IONS TAXIS PRECEDENCE OVER ACT 100 INSTRUCTIONS <br />IN ANY AREA 00 D1111I<ERENCa. <br />PA0111 2 OF 2 <br />