Laserfiche WebLink
MONITq#ING SYSTEM CERTIIWATION <br />CERTIFICATION /TEST DATE: Jul 12, 2012 <br />A1. FACILITY A2. OWNER <br />Name Olympian # 487 Name Flyers Energy LLC. <br />Address 983 Moffat Blvd., Manteca, CA 95336 Address 2360 Lindbergh Street, Auburn, CA 95602 <br />Phone # 530-885-0401 Phone # 530-885-0401 <br />Contact Amanda Appelt Contact Amanda Appelt <br />F. IN -TANK GAUGING / SIR EQUIPMENT: ■ Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gaugung equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ Yes ❑ No* Has all input wiring been Inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes ❑ No* Were all tank gauging probes visually Inspected for damage and residue buildup? <br />❑ Yes ❑ No* Was accuracy of system product level readings tested? <br />❑ Yes ❑ No* Was accuracy of system water level readings tested? <br />❑ Yes ❑ No* Were all probes reinstalled properly? — _- <br />❑ Yes ❑ No * Were all items on the equipment manufacturers maintenance checklist completed? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />G. LINE LEAK DETECTORS (LLD): ❑ Check this box if LLDs are not installed. <br />Complete the following checklist: <br />■ Yes <br />❑ No* <br />❑ N/A <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />(check all that apply) Simulated leak rate: ■ 3 g.p.h.; ❑ 0.1 g.p.h.; ❑ 0.2 g.p.h. <br />■ Yes <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />■ Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />■ Yes <br />❑ No* <br />❑ N/A <br />For mechanical LLDs, does the LLD restrict product flow if It detects a leak? <br />❑ Yes <br />❑ No* <br />■ N/A <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ Yes <br />❑ No * <br />■ N/A <br />- - -- ------ <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />or disconnected? <br />❑ Yes <br />❑ No* <br />■ N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />or falls a fast? <br />❑ Yes <br />❑ No* <br />■ N/A <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />Were all Items on the equipment manufacturers maintenance checklist completed? <br />■ Yes <br />❑ No* <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />MOLL - <br />H. COMMENTS <br />Replaced the leak detector in the Diesel tank. <br />© 2012 Walton Engineering, Inc. <br />Page 3 of 3 <br />