Laserfiche WebLink
Be sure to always READ THE DRAWINGS or plani <br />VTtomake sure thatyour • • points are the <br />same. Call Bravo Systems if any problem occursS <br />2 -Position and bolt down conversion frame to the dispenser pan using the <br />anchor plates of the conversion frame with minimum 1/2" Diameter bolts. Use plastic <br />caps to cover the bolts/nuts. <br />For Non -Bravo Sumps - A minimum of Four anchor bolts must be secured directly to concrete. <br />- Adjust electrical conduits to line up with the new dispenser if necessary. <br />A4 - Pre -plumb all product inlets and vapor recovery line with offsets and/or rigid <br />pipe and elbows if necessary. <br />J - Position and bolt down the dispenser to the conversion frame with the anchor <br />bolts provided. <br />NEW DISPENSER BASE <br />IVARIES <br />BRAVO <br />CONVERSION FRAME OFFSET <br />j <br />lamConversion Anchor Bolt <br />Anchor Plate <br />.: BRAVO BOX <br />Concrete Anchor Bolt a 4.. a FOR OLD <br />DISPENSER <br />e 6 ' <br />. M - _- 4 REA <br />OMNI 1ILM_ <br />k7i 70, <br />Oil <br />070 IL <br />• • <br />