Laserfiche WebLink
•" INFORMATIOVI <br />3. SPILL BUCKET TESTING INFORMATION <br />Test Method Used: D9 Hydrostatic U Vacuum U Other <br />Test Equipment Used: One Hour Observed Test I EQuinmei <br />Resolution: 1/16" <br />Identify Spill Bucket <br />Bucket Installation Type: <br />1 87 <br />Z Direct Bury <br />❑ In Sump <br />2 91 3 DSL <br />0 Direct Bury Direct Bury <br />❑ in In Sump <br />4 <br />Direct Bury <br />❑ In Sump <br />Wait time between applying <br />vacuum/water and start of test: <br />0 <br />0 0 <br />Test Start Time (Ti): <br />11:15 <br />12:00 11:15 <br />Initial Reading (RI): <br />1 1/2" from grade <br />1 1/2" from grade 1 1/2" from grade <br />Test End Time (170: <br />12:15 <br />13:00 12:15 <br />Final Reading (RF): <br />1 1/2" from grade <br />1 1/2" from grade 1 1/2" from grade <br />Test Duration (TF — Ti): <br />1.0 Hr. <br />1.0 Hr. 1.0 Hr. <br />Change in Reading (RF - Ri): <br />0.0 <br />0.0 0.0 <br />Pass/Fail Threshold or <br />Criteria: <br />0 <br />0 0 <br />Test Result: <br />Pass ❑ Fail <br />0 Pass ❑ Fail Z Pass <br />❑ Pass ❑ Fail <br />Comments: <br />—wow <br />Technician: <br />Date: 5/13/09 <br />2. TESTING <br />