Laserfiche WebLink
11/12/2008 WED 12:40 FAX 10008/013 <br />........... <br />Be sure to always READ THE DRAWINGS or plans to make <br />sure that your mounting points are the same. Call Bravo <br />Systems if any problem occurs. <br />A2 - Position and bolt down conversion frame to the dispenser pan using the anchor plates of the <br />conversion frame with minimum 1/2" Diameter bolts. Use plastic caps to cover the bolts/nuts. <br />For Non -Bravo Sumps - A minimum of Four anchor bolts must be secured directly to concrete. <br />A3 - Adjust electrical conduits to line up with the new dispenser if necessary. <br />A4 - Pre -plumb all product inlets and vapor recovery line with offsets and/or rigid pipe and elbows <br />if necessary. <br />A5 - Position and bolt down the dispenser to the conversion frame with the anchor bolts provided. <br />Dispenser'1 <br />Base <br />464 <br />Meters <br />SET <br />Cocnrete Anchor <br />Bolts <br />