Laserfiche WebLink
SWRCB, January 2002 <br />Test Method Developed By: <br />RECEIVED <br />J)%e0-6-41#14- <br />5. SECONDARY PIPE TESTING GO 14 91RAI 111 <br />X Piping Manufacturer ❑ Industry Standard ❑ Prof <br />❑ Other (Spec) <br />Test Method Used: <br />X Pressure <br />❑ Other (Spec) <br />❑ Vacuum <br />❑ Hydrostatic <br />Test Equipmen*Used:Pressure Gauges in Psi/Nitrogen <br />Piping Run # 1 <br />Piping Run # 2 <br />Equipment Resolution: 1/10-15 Psi <br />Piping Run # 3 Piping Run # <br />Piping MateriaFiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Ameron <br />Ameron <br />Ameron <br />Piping Diameter: <br />3" <br />3" <br />3" <br />Length of Piping Run: <br />Approx. 200' <br />Approx. 200' <br />Approx. 200' <br />Product Stored: <br />Regular 87 <br />Regular 91 <br />Diesel <br />Method and location of <br />piping -run isolation: <br />Test boot at STP #1 <br />Test boot at STP #2 <br />Test boot at STP #3 <br />Wait time between applying <br />pressure and starting test: <br />15 Minutes <br />15 Minutes <br />15 Minutes <br />Test Start Time: <br />9:45 <br />9:55 <br />10:05 <br />Initial Reading (Rj): <br />5 Psi <br />5 Psi <br />5 Psi <br />Test End Time: <br />10:45 <br />10:55 <br />11:05 <br />Final Reading (RF): <br />5 Psi <br />5 Psi <br />5 Psi <br />Test Duration: <br />1 Hour <br />1 Hour <br />1 Hour <br />Change in Reading (RF -RI): <br />0 Psi <br />0 Psi <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Detectable loss <br />No Detectable loss <br />No Detectable loss <br />Test Result: X Pass 0 Fail X Pass 0 Fail., X Pass Q Fail D Pass ; D Fail. <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />