Laserfiche WebLink
SWRCB, January 2002 <br />RECEIVED <br />Page of <br />10. SPILL/OVERFILL CONTAINMENT BOXES J ' ? 10 6 2014 <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested X EN IRONMENTAL <br />Test Method Developed By: ❑ Spill Bucket Manufacturer ❑ Industry Standard ❑ i n h <br />❑ Other (Spec) <br />Test Method Used: <br />❑ Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: <br />Equipment Resolution: <br />Spill Box # Spill Box # Spill Box # Spill Box # <br />Bucket Diameter: <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (RI): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF-RI): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />❑ Pass ❑ Fail ❑Pass Q Fail ❑ Pass ❑ Fail Pass ❑ Fail . , <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Spill/Overfill Boxes Tested Annually with Monitoring System Certification. <br />