Laserfiche WebLink
1 <br />LJ <br />Installation Guide Installation Procedure <br />r✓ii. ,.:✓av r rcr .. �. i air sic �2tyayu�ai�,.. , . .sot..✓. .. '.:.WWW_11M W <br />The Red Jacket <br />Tank vent port <br />(remove plug to <br />install vent tubing) <br />FXV/FX2V detector <br />installs in this 2"port <br />rjpumpsfinports.eps <br />Figure 1. FXV installation ports in The Red Jacket <br />3. Examine straight bore below two-inch thread for corrosion roughness. If found to be rough, smooth with <br />fine emery paper. <br />4. Apply UL -classified non-toxic pipe thread sealant to the two-inch threads on the detector. Lubricate o -ring <br />on the leak detector. <br />5. Screw the leak detector into the pump. Tighten with a wrench (top hex is 1-1 /4 inch). <br />6. Installation of vent tube and snap tap connectors. <br />For FX1 V models <br />a. Remove 1/4 -inch pipe plug from tank test port in the Packer (on 6 -inch Big -Flo applications, remove <br />the'/4-inch pipe plug from the riser/flange assembly, for The Red Jacket pumps, see Figure 2). <br />b. Apply a UL -classified non-toxic pipe thread sealant to the threads of the 1/4 -inch NPT straight vent <br />tube fitting and install in tank test port of the packer. On 6 -inch Big -Flo applications, the 1/4 -inch NPT <br />straight vent tube fitting may be installed into the riser/flange assembly. <br />c. Apply a UL -classified non-toxic pipe thread sealant to the threads of the 1/4 -inch NPT 90 -degree vent <br />tube fitting and install in the leak detector vent opening in the cap of the leak detector. <br />d. Install the vent tubing into both fittings and tighten per instructions on package. <br />3 <br />C <br />9 <br />7 <br />0 <br />U <br />