Laserfiche WebLink
L ac TM <br /> _ ct T 1' <br /> TECHNOLOGY FOR TANKS S.O. # 146422 <br /> ANO THEIR ENVNtONMENT <br /> .0 <br /> Owner QUIK STOP Site # 7 6 Date 06/05/95 <br /> Invoice Name/Address USTMAN INDUSTRIES, INC. 12265 W. BAYAND AVE. #110 LAKEWOOD, CO 80228 Phone <800> 253-8054 <br /> Site Name/AddressAttn: BRUCE McDUFFY <br /> QUIK STOP 1030 OLIVE AVENUE STOCKTON, CA 95215 <br /> TANKS LINES Leak Det <br /> See uAir TANKS and LINES Tested to CFR-40 Parts <br /> For Tank Dipped Dipped Probe Water Bubble Air Line Final Exist 280-281 &NFPA 329 Spec'S. <br /> For Dia.B Water Product Water Ingress Ingress Ingress TANK Line Delivery LINE LINE Leak LINE LD(s) NEW <br /> Loc. Material Level Level Level Detected Detected Detected ■ Material Syst.Type TEST TEST Rate ■ Pass/ LD(s) <br /> ST/ ■ ■ ■ ■ ■ ■ Tight ■ ■ ■ ■ ■ Tight Fail/ Tested <br /> _nk jTankTank FRP/ START START START or ST/ START END or or & Other: <br /> # Product Capacity Lined END END END Yes/No Yes/No Yes/No Fail Line# FRP PS/SS/GS TIME TIME GPH Fail NONE PASS <br /> 1 U N L tameter <br /> 1A ST PS :50 7 : 20 0 .000 F Y Exist LD SN/MDL/MFG: UNREADABLE DLD <br /> P New/2nd LD SN/MDL/M9219 4-7 3 5 6 FX 1 <br /> Material Percent o ill at Pump <br /> StartTime: Time of Test: <br /> Mfg.. UNE TEST PSI 50 . 00 <br /> IT T st I:Tim- rank nt De r2es:be Inclin r Dispenser Shear Valves <br /> PSEes: Operate es/no <br /> 2 PUN ameter <br /> 2A ST PS 6 : 55 7 : 25 . .0 .000 T P - Exist LD SN/MDL/MFG: UNREADABLE DLD <br /> atertarcent O ill at urnp New/2nd LD SN/MDL/MFG: <br /> Start Time: Time of Test: Mfg.: LINE resT PSI 50 .00 <br /> lank roe nC mometer Dispenser Shear valves <br /> End Time: lest PSI: Ent erevs:D <br /> Diameter <br /> ,. Operate(yes/no <br /> E] <br /> Exist LD SN/MDL/MFG: <br /> Material jTimr <br /> nt o iII at umpNew/2nd LD SN/MDL/MFG: <br /> Start Time: of Test: Mfg.. <br /> LINE TEST PSI <br /> an robe nc mometer Dispenser Shear valves <br /> End Time: Test I: Entr : D ree Operate es/no <br /> Diameter <br /> Exist LD SN/MDL/MFG: <br /> atenal rcent O 1 I at ump , New/2nd LD SN/MDL/MFG: <br /> Start Time: Time of Test: Mfg.: <br /> End Time: a^ roe <br /> LINE TEST PSI <br /> nclinometer <br /> meter Test I: nt : Decrees" <br /> Dispenser Shear Valves <br /> o rate es/no <br /> J. Exist LD SN/MDL/MFG: <br /> a ena ercent o i l at p <br /> New/2nd LD SN/MDL/MFG: <br /> Start Time: Time of Test: Mfg:TanLINE TEST PSI: <br /> End Tim es roe Inclinometer Dispenser shear valves <br /> Test I: Ent Der <br /> Diameter O rate es/no <br /> Exist LD SN/MDL/MFG: <br /> Material irceof:Tes1.' <br /> o at pNew/2nd LO SN/MOL/MFG: <br /> Start 71me: Mfg.: UNE TEST PSI: <br /> End <br /> 'rime- rankbe ncltnometer Dispenser Shear valves <br /> Test PSI: Ent D r <br /> Operate es/no <br /> Tanknology Corporation International <br /> TANKNOLOGY Region: WESTERN REGION Unit# 057 State LiC. #95-1525 State: CA 5225 Hollister St., Houston, TX 77040 <br /> NOTE: Original VacuTect Data recordings are reviewed by Tanknology's Audit Control Department and maintained on file. (800) 888-8563 • FAX (713) 690-2255 <br /> TAK-01 <br />