Laserfiche WebLink
LEAK RESPONSE PLAN <br /> Underground Storage Tank Monitoring Program <br /> FACILITY NAME: ke <br /> FACILITY ADDRESS: / ei t'V C c is <br /> The following procedures shall be followed by all personnel in the event of a leak or suspected <br /> leak: <br /> I. Store personnel shall notify the Franchisee immediately if a leak is suspected. <br /> 2. Franchisee will determine if the suspected leak is evidenced by inventory records or <br /> detected by monitoring equipment. <br /> A. If inventory problems are encountered, Franchisee will notify Quik Stop District <br /> Advisor to review records. No further action is necessary if the problem is due to <br /> arithmetic error. <br /> B. If equipment indicates a possible leak, Franchisee will contact Quik Stop Gasoline <br /> Department for maintenance dispatch to the site. No further action is necessary if <br /> the problem is due to malfunctioning equipment. <br /> 3. Continued indications of a suspected leak shall be reported to the Quik Stop Director of <br /> Environmental Affairs for review of site conditions and initiation of additional <br /> investigative or corrective action. <br /> 4. All subsequent actions shall be under the authority and supervision of the Director of <br /> Environmental Affairs. The Director shall determine the appropriate steps to be taken <br /> relative to specific site conditions. The steps taken by the Director may include some or <br /> all, but not limited to, the following actions: <br /> A. Tank and/or line integrity testing. <br /> B. Removal of product from the tank and lines. <br /> C. Local agency notification and submittal of an Unauthorized Release Report. <br /> D. Initiation of emergency abatement procedures. <br /> E. Repair,replacement, or permanent abandonment of the UST system. <br /> F. Initiation of site assessment or remedial activities, submittal of work plans. <br /> Responsible on-site party,Franchisee: 0 <br />