Laserfiche WebLink
etNollla.v <br /> a e TM <br /> TEST REPORT <br /> 090870 <br /> :FOR TANKS S.O. # <br /> NeENT <br /> Date 08/02/93 <br /> Owner QUICK STOP Site # 7 6 <br /> Phone <800> 253-8054 <br /> Invoice Name/Address USTMAN INDUSTRIES, INC. 12265 W. BAYAND AVE. #110 LAKEWOOD, CO 80228 <br /> Attn: BRUCE McDUFFY <br /> Site Name/Address QUICK STOP 1030 S. OLIVE STOCKTON, CA <br /> TANKS LINES Leak Det <br /> See Ullage TANKS and LINES Tested to CFR-40 Parts <br /> Dia Tank Dipped Dipped Probe Water Bubble Air Line Final Exist 280-281 &NFPA 329 Specs. <br /> g' Dia.& Water Product Water Ingress Ingress Ingress TANK Line Delivery LINE LINE Leak LINE LD(s) NEW <br /> For Material Level Level Level Detected Detected Detected ■ Material Syst.Type TEST TEST Rate ■ Pass/ LD(s) <br /> ST/ ■ ■ 11111 ■ ■ Tight ■ ■ ■ ■ ■ Tight Fail/ TestedOther: <br /> Wank Tank Tank FRP/ START START START or ST/ START END or or & <br /> # I Product Capacity Lined END END END Yes/No Yes/No Yes/No Fail Line# FRP PS/SS/GS TIME TIME GPH Fail NONE PASS <br /> 1 REG lameter lA ST PS 9:44— .0:14 0 .000 P P N <br /> Exist LD SN/MDL/MFG. <br /> Njj New/2nd LD SN/MDL/MFG: <br /> aterial 7597cnt o ill at Pump 50.00 <br /> Start Time: Time of Test: Mfg.: LINE TEST PSI <br /> TankPro a Inclinometer Dispenser Shear Valves <br /> End Timg: Test PSI: nt : D r s: �v /� /� /► p} O erase es/no <br /> 2 SUPR <br /> Diameter 2A ST PS ®:18 0148 0 .000 N P Exist LD SN/MDL/MFG: <br /> UNL New/2nd LD SN/MDL/MFG: <br /> Material O I at Pump LINE TEST PSI 50 .00 <br /> Stan Time: Timeime of of Test: Mfg. <br /> anProbe nc urometer Dispenser Shear valves <br /> End Time: Test PSI: Ent : D rees: Operate es/no <br /> lameter <br /> Exist LO SN/MDL/MFG: <br /> New/2nd LD SN/MDL/MFG: <br /> arena rCCM O at Ump LINE TEST PSI <br /> Start Time: Time of Test:: Mf .. <br /> Tank roe nc urometer Dispenser Shear Valves <br /> End Time: T PSI: nt : D r : Operate es/no <br /> Diameter Exist LD SN/MDL/MFG: <br /> New/2nd LD SN/MDL/MFG: <br /> Material Percent of Fillat ump <br /> Start Time: Time Of Test: Mfg.: LINE TEST PSI <br /> lanK Pro a Inclinometer Dispenser Shear Valves <br /> End Timl, Test PSI: Ent : r Operate es/no <br /> Diameter ) <br /> Exist LO SN/MDL/MFG: I <br /> New/2nd LD SN/MDL/MFG: <br /> material r0ent o I at ump <br /> Start Time: Time of Test: Mf .. LINE TEST PSI: <br /> Tank roe Inclinometer Dispenser shear Valves <br /> End Time: T PSI: n D r Operate es/no <br /> Iometer Exist LO SN/MDL/MFG: <br /> New/2nd LD SN/MDL/MFG: <br /> aten rcent o I at ump <br /> Start Time: Time of Test: Mfg.: LINE TEST PSI: <br /> an ro nc Inometer Dispense shear Valves <br /> End Tim : _ T t P I• Entr: D29=1 O rate I es/no <br /> Tanknology Corporation International <br /> TAN'KNOLOGY Region: WESTERN REGION Unit# 051 State Lic. # State: CA 5225 Hollister St., Houston, TX 77040 <br /> NOTE: Original VacuTect Data recordings are reviewed by Tanknology's Audit Control Department and maintained on file. (800)888-8563 • FAX (713) 690-2255 <br /> TAK-0t <br />