Laserfiche WebLink
A KNOLOG VacuTect"m TEST REPORT <br /> S.O. # <br /> TECHNOLOGY FOA TANKS <br /> AND THE1II EIMONMENT D 1, <br /> Date 08, <br /> Owner QUICK> STOP Site # <br /> R Phone gi?,R; 5 8'-,54 <br /> Invoice Name/Address U STMAN I NETJ STR I ES . INC , 12265 ,W, AVE. '4110 LAKEt OOV . CC 802 2`8 <br /> Attn: RFJvE ted _,DAFFY <br /> Site Name/Address <br /> QUICK: §T.:>F I0ut0 S 01,Ivi✓ ST'1i--'kT.�--';'d .'n <br /> TANKS LINES Leak Det <br /> i <br /> See Ullage TANKS and LINES Tested to CFR-40 Parts <br /> See Tank Dipped Dipped Probe Water Bubble Air Line Final Exist 280-281 &NFPA 329 Spec's. <br /> DiagFor Dia.& Water Product Water Ingress Ingress Ingress TANK Line Delivery LINE LINE Leak LINE LDS) NEW <br /> Loc. Material Level Level Level Detected Detected Detected ■ Material Syst.Type TEST TEST Rate ■ Pass/ LD(s) <br /> ST/ ■ ■ ■ ■ ■ ■ Tight ■ ■ ■ ■ ■ Tight Fail/ Tested Other: <br /> Tank Tank FRP/ START START START or ST/ START END or or & <br /> Product Capacity Lined END END END Yes/No Yes/No Yes/No Fail Line# FRP PS/SS/GS TIME TIME GPH Fail NONE PASS <br /> Diameter <br /> Exist LD SN/MDL/MFG. <br /> A, <br /> New/2nd LD SN/MDL/MFG: <br /> ateria rcent o III at ump <br /> Start Time: Time of Test: Mfg.. LINE TEST PSI <br /> Tank robe nc Dispenser nometer ® p <br /> enser Shear Valves <br /> En Time: Test PSI: Ent : Operate es/nol <br /> Diameter <br /> Exist LD SN/MDL/MFG: <br /> New/2nd LO SN/MDL/MFG: <br /> -Mat—e'na7 Percent of Fill at Pump <br /> Start Time: Time of Test: Mfg.: - � LINE TEST PSI <br /> Tank roe 7-371ome er <br /> Dispenser Shear Valves <br /> End Time: Test PSI: Entry: Dear Operate es/no <br /> rameter <br /> �,,. NO,` <br /> Exisl LD SN/MDL/MFS <br /> New/2nd LD SN/MDL/MFG: <br /> atenal e'rm"n't 711IT at Pump <br /> Start Time: Time of Test: Mfg.: ' f � �g LINE TEST PSI <br /> .,_. _.c: •-�f .. m;�a. 'mss; °s' <br /> Tank r0 be inclinometer Dispenser Shear Valves <br /> End Ti T P I: Ent : Oeste eslno <br /> lameter r '� aux"' `-c< ,� F. $ '� ' Exist LD SN/MDUMFG: <br /> New/2nd LO SN/MDL/MFG: <br /> alenal rcenf O 11 atHUMID T�* '� '� �-� } "' LINE TEST PSI <br /> Start Time: Time of Test: Mfg.: <br /> lanK Probe Inclinometer Dlspenser Shear Valves <br /> End Ti PSI: Entry: De rees: O erste es/no <br /> lameter Exist LD SN/MDL/MFG: <br /> New/2nd LD SN/MDL/MFG: <br /> -material ercent OFill at PumpLINE TEST PSI: <br /> Start Time: Tim@ of Test: Mfg.: <br /> Tank robe Inclinometer Dispenser Shear Valves <br /> Ti T Ent : D rees: operate es/no <br /> Diameter Exist LD SN/MDL/MFG: <br /> New/2nd LD SN/MDL/MFG: <br /> Material Percent of Fill at M :p LINE TEST PSI:Time of Test:Time; <br /> lark. robe nc inometer Dispenser Shear Valves <br /> End Tim T t PSI: Ent D Operate es/no <br /> Tanknology Corporation International <br /> TANKNOLOGY Region: WESTERN RF(ITON Unit# State Lic. # State: 5225 Hollister St., Houston, TX 77040 <br /> NOTE: Original VacuTect Data recordings are reviewed by Tanknology's Audit Control Department and maintained on file. (800) 888-8563 • FAX (713) 690-2255 <br /> TAK-01 <br />