My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
O
>
OLIVE
>
1030
>
2300 - Underground Storage Tank Program
>
PR0231704
>
COMPLIANCE INFO_1986-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 8:54:53 AM
Creation date
6/3/2020 9:51:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2001
RECORD_ID
PR0231704
PE
2361
FACILITY_ID
FA0001060
FACILITY_NAME
QUIK STOP MARKET #2076*
STREET_NUMBER
1030
Direction
S
STREET_NAME
OLIVE
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
157-264-22
CURRENT_STATUS
01
SITE_LOCATION
1030 S OLIVE ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231704_1030 S OLIVE_1986-2001.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Pressure piping systems shall. be tested under actual operating <br />pressures, and statement describing results must be included. <br />See #'1 Above <br />8. If applicable`, has the isolation procedure in addition to the <br />product line been completed? N/A <br />NDE TECHNOLOGY, 1NC. PROPRIETARY <br />WATT INC. :31::31 FATRIIAVFN DRIVE, I3AKERSF'IFLD, CA 93:308 (80":,) '222.4)827 <br />CAPACITY 10000 g PRFCISION UNDERGROUND <br />TANH TESTING <br />RESULTS Patent Pending <br />TANK <br /># Iln 1.eaded <br />PAGE <br />5 <br />STAT <br /># 76 <br />`T`E'ST PROCEDURES <br />TEST <br />DATE: 07/27/89 <br />Copyright: <br />1985 <br />NDF TECHNOLO(,Y, <br />INC.. PROPRIETARY <br />1. <br />Piping Pressure,- Test - <br />N/A <br />2. <br />Pneumatic Pi-essure Data <br />Amount of pressure <br />applied <br />to Sys t. em: <br />N/A <br />3. <br />Amount of pressure drop <br />if any: <br />N/A' <br />-1. <br />Amount. of time elapsed <br />during the <br />fast. N/'A <br />5. <br />Piping.Pressur—o Test Leak <br />Rite iS <br />N/A <br />If computer is used sere <br />computer <br />printout or lozali <br />ge, rate and all <br />test parameters on Test <br />Results, <br />Pal:•t. IV, Page <br />11, 1.2 <br />Test resuais of storage <br />systems <br />that tit:il i.;,:e <br />pl-OSSUI- Z(sd p:ip.ing <br />systems w i I I not b <br />recognized <br />un 1.ess the <br />IUI-1)1ne; Pump iS <br />activated after the c::omplet.-ion <br />of <br />a succe sst'u] <br />systt'In t'esl. <br />6. <br />Was turbine pump activated? <br />N/A <br />7. Pressure piping systems shall. be tested under actual operating <br />pressures, and statement describing results must be included. <br />See #'1 Above <br />8. If applicable`, has the isolation procedure in addition to the <br />product line been completed? N/A <br />NDE TECHNOLOGY, 1NC. PROPRIETARY <br />WATT INC. :31::31 FATRIIAVFN DRIVE, I3AKERSF'IFLD, CA 93:308 (80":,) '222.4)827 <br />
The URL can be used to link to this page
Your browser does not support the video tag.