Laserfiche WebLink
DEC -17-1998 TU 10:44 AM1 STOP MKTS INC FAX O. 5106571544 P, 06 <br />0 <br />WRIT71EN MONT170RING PROCEDURES <br />FOR <br />14144 L%Vn7M1J I I I i I A 15MU- all <br />,5 gigs <br />A. The interstitial space of each tank and product line is monitored continuously by probes <br />within the brine reservoir and turbine sump, respectively. <br />B. The Gilbarco EMC 3.1 tank and line monitoring system is manufachard by Vecder- <br />Root, Leak conditions trigger visual and audible alarms located in the monitoring system <br />control panel, as well as shut off power to turbines, <br />The monitor control panel is located in the market storeroom, The monitor is placed in <br />test mode daily to clieck alarm Nnetion. Results are recorded on a "Daily Monitoring <br />System Inspection Log". <br />D. Monitoring is the responsibility of Amar and Manject Singh, Franchisees, or their <br />designated duty clerk. Maintenance of the monitoring equipment is the responsibility of <br />Quik Stop Markets, Inc. ReVired work will be authorized by Mike Karvelot, Director of <br />Environmental Affairs. <br />E, If an alarm occurs, the Franchisee will immediately contact the Quik Stop Oasoline <br />Department, which will in turn dispatch a qualified service contractor to the site, The <br />service contractor will determine the cause of alarin and advise Quik Stop of site <br />conditions. If an unauthorized release to secondary containment has occurred, action will <br />be immediately taken to implement the Writteu Response Plan. <br />101 J;JJ irvig its F" <br />G. A description of the gasoline system operation and operator's responsibilities are inclu'l <br />in the Franchise Agreement Initial training in operation of the tank system and <br />monitoring equipment is conducted "on the job" under the supervi sion of Quik Stop <br />personnel, <br />