Laserfiche WebLink
V( Piping (cross-sectional dim including connections to tank and dispensers). -Tr%57�r,�� <br />(A) Vent and tank riser primaricainmenc system equipped with overfill potion system that: <br />Restricts delivery of flow to tank CSection 2635 (b) (2) (B) or CC)], or <br />Provide positive shut off of flow to the tank at no more than 95 % (Section 2635 (b)(2)(C)], or <br />(B) vapor recovery piping designed so it cannot contain Liquid phase product, or <br />(C) Suction piping (below grade piping operates at less than atmospheric pressure) CSection 2636 (a) (3)] <br />Sloped so contents of the pipe will drain back into the storage tank if the suction is <br />released. <br />No valves or pumps installed below grade. <br />/ Inspection method provided to demonstrate compliance with section 2636 (a) (3). <br />(0) Corrodible underground piping protected against corrosion (Section 2636 (b)). <br />(E) Underground primary piping will meet all of the following requirements <br />✓/ Primary piping in contact with hazardous substance under normalopefation conditions shall be: <br />installed inside a secondary containment system in the form of: ,,//secondary pipe_Vault or <br />_lined trench to be sloped to a collection sump at the low point of the piping. <br />V/ Primary piping and secondary containment systems will be installed in accordance with industry <br />code of practice and voluntary consensus standards.. <br />Lined trench used as secondary containment <br />Material compatible with the substance stored. <br />Covered and capable of supporting any expected vehicular traffic. <br />(F) Underground piping with secondary containment will be equipped and monitored as follows: <br />✓/ Secondary containment will be equipped with a continuous monitoring system convected to an audible <br />and visual alarm system. <br />Automatic line leak detectors will be installed on pressurized piping <br />Manufacturer: Model: <br />_ Annual monitoring will be conducted an the pressurized piping with secondary containment. <br />v/ Annual tine tightness test will not be required if the continuous monitor shuts down the pump and <br />activates the alarm system when a release is detected and when the continuous monitoring system <br />fails or is disconnected. <br />State Water Resources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br />Plan review and operating permit fees paid. <br />What is the approximate depth to ground water: 8 0 <br />(include source of information - borehole logs, monitoring watt data, water <br />studies, etc.) <br />/ SAaJ ?0,44 r.J Goyn2'i•, G2ct/)vIp t�r4Z-sYL i2cnPotZT — i q�{S <br />v/ Total rxad)er of tanks on site after installation: !/ <br />County/City Fire District and Building Department notified. <br />In the event contamination is observed, confirmed or suspected as a result of a tanking UST system it is your <br />responsibility Lin accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br />Requirements] as an owner or operator to submit a workplan to PNS-EHD Site Mitigation Unit prior to initiating any <br />ass or r7rator <br />iation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br />T r must acknowledge this responsibility for workplan sLdufttat by signature and date below. <br />i <br />Title �cN DW? M�/+�C�L Date Z8 SQL q8 <br />WITIOMS OF APPR <br />-zy re' <br />Owner Signature date <br />