Laserfiche WebLink
9. Z Piping (cross-sectionat dia including connections to tank and dispen <br />(A) Vent and tank riser primary containment system equipped with overfill prevention system that: <br />Restricts delivery of flow to tank [Section 2635 (b) (2) (8) or CC)], or <br />Provide positive shut off of flow to he tank at no more than 95 % (Section 2635 (b)C2)(C)], or <br />(a) Vapor recovery piping designed so it cannot contain liquid phase product, or <br />(C) Suction piping (below grade piping operates at less than atmospheric pressure) [Section 2636 (a) (3)] <br />Sloped so contents of the pipe will drain back into the storage tank if the suction is <br />released. <br />No valves or pumps installed below grade. <br />/ Inspection method provided to demonstrate compliance with section 2636 (a) (3). <br />Corrodible underground piping protected against corrosion (Section 2636 (b)). <br />(E) Underground primary piping will meet alt of the following requirements <br />I//Primary piping in contact with hazardous substance under normal opotion conditions shall be: <br />installed inside a secondary containment system in the form of: Vsecondary pipe_Vautt or <br />_lined trench to be sloped to a collection sump at the low point of the piping. <br />_I/ Primary piping and secondary containment systems will be installed in accordance with industry <br />code of practice and voluntary consensus standards.. <br />Lined trench used as secondary containment <br />Material compatible with the substance stored. <br />Covered and capable of supporting any expected vehicular traffic. <br />(F) Underground piping with secondary containment will be equipped and monitored as follows: <br />Secondary containment will be equipped with a continuous monitoring system corrected to an audible <br />and visual alarm system. <br />_ Automatic line leak detectors will be installed on pressurized piping <br />Manufacturer: Model: <br />_ Annual monitoring will be conducted on the pressurized piping with secondary containment. <br />I// Annual tine tightness test will not be required if the continuous monitor shuts down the pump and <br />activates the alarm system when a release is detected and when the continuous monitoring system <br />fails or is disconnected. <br />20. State Water Resources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br />21. _7 Plan review and operating permit fees paid. <br />22. What is the approximate depth to ground water: <br />(include source of information - borehole togs, monitoring well data, water <br />studies, etc.) WOR IqR J <br />S�A-a/ -0A(Qy t,J GcaynlrN G2oywD s2 - <br />23. +`�/ Total number of tanks an site after instattatiot: <br />24. " County/City Fire District and Building Department notified. <br />25. Y in the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br />responsibility Cin accordance with (CCR) Titte 23, Division 3, Chapter 16, Article 11, Corrective Action <br />Requirements] as an owner or operator to submit a workplan to PHS-EHD Site Mitigation Unit prior to initiating any <br />asses or remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br />T r razor must acknowledge this responsibility for workplan submittal by signature and date below. <br />® Title & 4 ®eP? M=�%��- Date Z8 5vU S <br />CONDITIONS OF APPR <br />P <br />