My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
O
>
OLIVE
>
1030
>
2300 - Underground Storage Tank Program
>
PR0231704
>
COMPLIANCE INFO_1986-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 8:54:53 AM
Creation date
6/3/2020 9:51:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2001
RECORD_ID
PR0231704
PE
2361
FACILITY_ID
FA0001060
FACILITY_NAME
QUIK STOP MARKET #2076*
STREET_NUMBER
1030
Direction
S
STREET_NAME
OLIVE
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
157-264-22
CURRENT_STATUS
01
SITE_LOCATION
1030 S OLIVE ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231704_1030 S OLIVE_1986-2001.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging/SIR Equipment: (beck this box if tank gauging is used only for inventory control. <br /> j� Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com lete the folulo ing checklist: <br /> ❑ Yes ❑ Now Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Y-es ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ Now Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* 1 Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ Now Were all prdbes reinstalled properly? <br /> ❑ Yes ❑ Now Were all'items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be correct6d. <br /> G. Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the follo ing checklist: <br /> VCIYes <br /> ❑ Now For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rater 3 g.p.h.; ❑0.1 g.p.h; ❑0.2 g.p.h. <br /> ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Now Was the testing apparatus properly calibrated? <br /> ❑ Now For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Now For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> 90 N/A <br /> ❑ Nn <br /> NowFor electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> or disconnected? <br /> f3Ydes For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> or fails a test? <br /> ❑ oFor electronic LLDs,have all accessible wiring connections been visually inspected? <br /> jP N/A <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> P•1loe 3 of 3 413101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.