Laserfiche WebLink
F. In-Tank Gauging/SIR Equipment: (beck this box if tank gauging is used only for inventory control. <br /> j� Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com lete the folulo ing checklist: <br /> ❑ Yes ❑ Now Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Y-es ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ Now Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* 1 Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ Now Were all prdbes reinstalled properly? <br /> ❑ Yes ❑ Now Were all'items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be correct6d. <br /> G. Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the follo ing checklist: <br /> VCIYes <br /> ❑ Now For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rater 3 g.p.h.; ❑0.1 g.p.h; ❑0.2 g.p.h. <br /> ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Now Was the testing apparatus properly calibrated? <br /> ❑ Now For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Now For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> 90 N/A <br /> ❑ Nn <br /> NowFor electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> or disconnected? <br /> f3Ydes For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> or fails a test? <br /> ❑ oFor electronic LLDs,have all accessible wiring connections been visually inspected? <br /> jP N/A <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> P•1loe 3 of 3 413101 <br />