My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
O
>
OLIVE
>
1030
>
2300 - Underground Storage Tank Program
>
PR0231704
>
COMPLIANCE INFO_2002-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 8:59:27 AM
Creation date
6/3/2020 9:51:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2007
RECORD_ID
PR0231704
PE
2361
FACILITY_ID
FA0001060
FACILITY_NAME
QUIK STOP MARKET #2076*
STREET_NUMBER
1030
Direction
S
STREET_NAME
OLIVE
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
157-264-22
CURRENT_STATUS
01
SITE_LOCATION
1030 S OLIVE ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231704_1030 S OLIVE_2002-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECONDARY LINE TESTING <br />Test Method By: o Manufacturer • Industry Standard o Professional Engr o Other (see below) <br />Test Method Uses: • Pressure o vacuum o Hydrostatic o Other (see below) <br />Measuring Equipment Used: Pressure Gauge (range 0 to 15 psig) <br />nescrintinn <br />Line #1 Line 92 <br />Tank product <br />Gasoline - 87 <br />Gasoline - 91 <br />Pipe manufacturer <br />Smith <br />Smith <br />Pipe material <br />FRP <br />FRP <br />Primary pipe diameter (inches) <br />2" <br />2" <br />Secondary pipe diameter (inches) <br />3" <br />3" <br />Method of secondary pipe isolation <br />Termination Boot <br />Termination Boot <br />Location of secondary pipe isolation <br />Sump <br />Sump <br />Estimated length of piping run (feet) <br />55' <br />65' <br />(include length of branch runs) <br />Comments: <br />2004 Walton Engineering, Inc. <br />Wait time for pressure to stabilize (hr:min) <br />0:05 <br />0:05 <br />Test start time <br />Initial pressure (psig) <br />12:25 PM <br />5.0 <br />12:25 PM <br />5.0 <br />Test end time <br />1:25 PM <br />1:25 PM <br />Final pressure (psig) <br />5.0 <br />5.0 <br />Test duration (hr:min) <br />1:00 <br />1:00 <br />Change in pressure (psig) <br />Pass/Fail threshold (psig) <br />0.0 <br />0.5 <br />0.0 <br />0.5 <br />TEST RESULT <br />--- PASS <br />PASS <br />Comments: <br />2004 Walton Engineering, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.