My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
O
>
OLIVE
>
1030
>
2300 - Underground Storage Tank Program
>
PR0231704
>
COMPLIANCE INFO_2002-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 8:59:27 AM
Creation date
6/3/2020 9:51:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2007
RECORD_ID
PR0231704
PE
2361
FACILITY_ID
FA0001060
FACILITY_NAME
QUIK STOP MARKET #2076*
STREET_NUMBER
1030
Direction
S
STREET_NAME
OLIVE
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
157-264-22
CURRENT_STATUS
01
SITE_LOCATION
1030 S OLIVE ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231704_1030 S OLIVE_2002-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F." in --Tank Gauging / SIR (Equipment: ZChdiis box if tank gauging is used only for inventory contra <br />❑ heck this box if no tank gauging or SIR equipment is installed <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Comniete the following checklist: <br />© Yes <br />0 Noy` <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />0 Yes <br />0 Nov <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />0 Yes <br />❑ Nov <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />0 No's <br />Was accuracy of system water level readings tested? <br />0 Yes <br />❑ No* <br />Were all probes reinstaited properly? <br />0 Yes <br />0 Nov <br />Were all items on the equipment manufacturer's maintenance checklist completedl <br />in the Section L% below, oescrrne now ana when =nese aeucrencres (acre ur WUL uc cve a <br />G. Line Leak Detectors (LLD): Q Check this box if LLDs are not installed. <br />d''mmnloff. the f�jowinu checklist: If <br />es <br />0 o� <br />For equipment start-up or annual equipment cation, was a Teals. simulated to verify �LI D pedo=anc <br />❑ A <br />(Check all that apply) Simulated leak rate: 3 g p.h.; ❑ 0.1 g ph ; Q 0.2 g p h. <br />Q <br />No# <br />Were all LLDs confirmed operational and accurate within. regulatory requirements? � <br />yes <br />Q Nov <br />Was the testing apparatus properly calibrated? <br />Yes <br />0 No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leW. <br />0 N/A <br />® yes <br />® o* <br />Eor electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />Q yes <br />El <br />. ❑ o* <br />For electronic LLDs, does the turbine automatically shut off if any portion. of the monitoring system is casabl� <br />N/A <br />or disconnected? <br />LDs, does the turbine automatically shut off if any portion of the monitoring system malfimctia� <br />❑ Yes <br />© o <br />FoEll <br />IJA <br />or0 <br />Yes <br />C� o- <br />FoLDs, have ail accessiible wiling connections beenvisnaityinspected? <br />N/A <br />❑ No* <br />Wn the equipment manufacturer's maintenance checklist completed?' <br />r.. aw-.Rection F. <br />below, describe how and when these deficiencies were or will be corrected. <br />Page 3 o <br />
The URL can be used to link to this page
Your browser does not support the video tag.