Laserfiche WebLink
F. In Tank Gauging /SIR Equipment: <br />IN Check this box if tank gauging is used only for inventorycontroL <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in. tank gauging equipment is used to perform leak detection monitoring. <br />Complete the fb6winz cheddist: <br />❑ Yes. I ❑ No* Has all input wiring been inspected for properentry and termination; mcludingtesting for ground faaft? - <br />❑ Yes ❑ No* Were all tank gauging probes visually inspected fordamage. and residue buildup?-- — — - <br />❑ Yes ❑ No* Was accuracy of system product level readings tested? <br />❑ Yes ❑ No* Was ao urAcy of system water level readings tested? <br />❑ Yes ❑ No* Were all probes reinstalled properly? <br />® Yes ❑ No* Were all items on the equipment manufitcamer's maintenance d=klist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be oor. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />m lete the following cheddist: <br />Yes ❑ No* I For equipment start-up or annual equipment certification. was a leak simulated to verify ILD performance? <br />❑ N/A (CheckaU that apply) Simulated leaktate: 4 3 g p h; ❑ 0.1 g p.h ; ❑ 02 g piL <br />,A Yes <br />10 No* <br />I Were all LLDs confirmed operational and accmte within regulatory requirements? <br />Yes <br />f ❑ No* <br />I Was the tcsring apparatus pmpc dy calibrated? <br />Yes <br />1❑ No* <br />❑ N/A <br />I For mechanical LLDs, does the ILD restrict product flow if it detects a leak? <br />❑ Yes <br />❑ No* <br />N/A <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ `Yes <br />❑ No* <br />tk NIA <br />.For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />or disconnected? <br />❑ Yes <br />® No* <br />NIA <br />For elecu onic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />or fails a test? <br />® Yes <br />❑ No* <br />NIA <br />For electronic LLDs, have alt accessible wiring connections been visually inspected? <br />Ryes, . <br />0 No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section $ below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />0 <br />P.agc 3 of 3 <br />, -;,!;1i <br />