Laserfiche WebLink
UNDER DISPENSER CONTAINMENT (UDC) TESTING <br />.......... - ............. <br />........... ........ .......... ................ <br />............. ...... <br />..... .. . ...... <br />..................... Q. ....... ...... <br />r to 0$ <br />0.:.: � - * i 'sl i* <br />0 <br />... ...... ...... .. ... Y' staw, 0 E 0 he <br />fm t 0. iiBy*-. <br />o h d �: an <br />0 MI . F.er. <br />....... ............ ....... - .... - .......... .............. . . ..... ...... <br />.......... ................. ...... ...... ........ - ...... - <br />............... - ........... I ......................... ....... <br />.eg ....... -- .... - ... .......... -- .......................... ...... ................ <br />................ ....... .... .......... ................. <br />.................. ...... <br />.T. ....... <br />xi ...fe S fe V <br />.......... ................ <br />................. .. ..................... .... .. ... <br />. ............... <br />Warru:«<:>::>::;. <br />.. I...I......."4...0..... .. ..,...a <br />-...a.. <br /><;g qd mentZLSVWch190�1"XiCtr p.c.a... d..." ...4. ..: ...y......ft... ..2ouii..1..........A....IR....d..M... <br />........... <br />................ <br />............. <br />................... - <br />.......... . . . . . . . . ............... - ...... ..... . ... ........ ....... ............. <br />..... . ....... .......................................... ......... . .. . ............ <br />....................... ....... ....... ......... - ... ....... <br />........ . ..... ........ .. .. ..................... ............ ....... - ...... ......... <br />..... .... .... <br />................... <br />............. <br />.......... ...... ... [P -40n, ....... ..... .. . .... ..... <br />. . . ............... . ....... ... <br />UDC Manufacturer <br />... Bravo <br />....... Bravo <br />..... ....... <br />UDC Material <br />Steel <br />...... ....... <br />.... ....... ....... <br />....... .... <br />Steel ....... ...... ...... <br />UDC Depth (inches) <br />Height from UDC bottom to highest <br />Bottom <br />Bottom <br />piping penetration <br />Height from UDC bottom to lowest <br />Bottom <br />Bottom <br />........ ....... <br />electrical penetration <br />..... <br />...... <br />...... <br />....... <br />.... ....... ... ... - <br />...... <br />Condition of UDC prior to testing <br />Dry <br />X....... Dry <br />... ....... <br />Portion of UDC tested <br />.... Entire <br />....... <br />....... ...... <br />Entire ....... ...... <br />Type of shut -down present <br />Float <br />Float ...... <br />Was sensor removed for testing? <br />...... N/A <br />..... ...... <br />.... ...... .... <br />.... - N/A ..... ...... <br />Was sensor Properly replaced after testing? <br />N/A <br />N/A ...... <br />...... <br />...... <br />Wait time for water level to stabilize (hr:min) <br />...... <br />...... <br />0:39 <br />0:40 <br />Depth of water level from UDC bottom (in.) <br />...... <br />6" <br />...... ...... <br />6" . . .... ... ...... <br />.... Test start time <br />...... 10:47 AM <br />....... ..... <br />....... ..... <br />10:48 AM ....... <br />...... Test end time <br />...... <br />....... 11:17 AM <br />...... <br />....... ....... <br />11:18 AM ....... <br />.... ...... .... — <br />Test duration) <br />0:30 <br />0:30 ...... <br />....... ..... <br />..... ....... <br />Change in water level) inches) <br />...... <br />0.000 <br />....... ...... <br />0.000 .... ...... <br />...... .... <br />Pass/Fail threshold (0.005 inches/'/ Hr.) <br />0.005 <br />0.005 <br />TEST RESULT <br />PASS <br />.... <br />PASS ....... ..... <br />....... ........ ...... <br />Comments: <br />.... ...... <br />© 2002 Walton Engineering, Inc. <br />