Laserfiche WebLink
LU/U1/LUU9 THU 1b: 1S rklA LU94b2fS433 <br />********************* <br />*** FAX TX REPORT *** <br />********************* <br />TRANSMISSION OK <br />Z)OU znu <br />JOB NO. <br />2922 <br />DESTINATION ADDRESS <br />919163731172 <br />PSWD/SUBADDRESS <br />❑ electronic Serial #: <br />DESTINATION ID <br />❑ line test programmed <br />ST. TIME <br />10/01 16:12 <br />USAGE T <br />01,05 <br />PGS. <br />1 <br />RESULT <br />OK <br />SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />y' 600 East Main Street, Stockton, CA 95202-3029 <br />` Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.s6gov.org/ehd <br />ehd <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERMICE REQUEST INSPECTION <br />REPORT <br />SERVICE <br />Leak detector <br />® <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ <br />❑ line test programmed <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ <br />❑ electronic Serial #: <br />❑ line test programmed <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ line test programmed <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ <br />❑ fail safe Serial #: <br />❑ NA <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />SERVICE <br />Spill bucket ❑ minimum 5 gallon <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment testing for: <br />UDC(s) Piping <br />Sump(s) UST(s) <br />❑ <br />Testing for the above components are next due by: <br />Note: Please be aware that 2° containment components are required to be tested upon <br />installation. 6 months after. and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />1 <br />