Laserfiche WebLink
=acility Name <br />ofInspection <br />azellon Av*nue, P. 0. Box 2M <br />1601 E* <br />• r +n. call(OMIS •= <br />2M/48"781 <br />Jo91 Khanna, M.0.. M.®. .. 0181MW(h 011kW <br />n/. ,. t. ALTERNATIVE <br />.R :.: . <br />:L-:O_ZAnnprecision test on • piping. <br />11. <br />aIly Inventory reconciliation with submission of quarterly statement regarding <br />compliance i #variation. <br />. <br />IPOIne leak detectoCs on pressurized piping.aily operational check of suction piping function. <br />F/Calibrated meters for inputs and withdrawals: <br />Weights f Measures sticker <br />mplementation of this monitoring alternative requires that the following CIRCLED Items <br />e,completed <br />by <br />i.. • dates. <br />Precision <br />officethis i. •...ys •.. «. test. Yand -results submitted to <br />Pipeline leak detectors must be installed on pressurized piping by <br />-)Daily inventory reconciliation awst be started immediately. with records maintain'sd <br />at the facility for review. <br />Document daily check of suction piping function starting immediately. <br />Submit quarterly statement to this office that allowable variation on inventory <br />reconciliation has not been exceeded or a list of dates and vari hat <br />exceeded allowable.* The first statement is due by <br />Dispenser meter(s) must be calibrated by Zl— / 57��Tjr with copy of <br />certification or Weights and Measures sti ef-7Kumber submitted to this office. <br />the above compliance dates cannot be met. contact this office prior to the specified <br />te. <br />If allowable daily inventory variation is exceeded. refer to Section 2644(f) for <br />required actions. <br />86 Mei 1 <br />