My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STIMSON
>
2000
>
2300 - Underground Storage Tank Program
>
PR0231732
>
COMPLIANCE INFO_1985-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2024 4:16:30 PM
Creation date
6/3/2020 9:51:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1998
RECORD_ID
PR0231732
PE
2361
FACILITY_ID
FA0003648
FACILITY_NAME
STKN ARMY AVIATION SUPP FACILITY*
STREET_NUMBER
2000
STREET_NAME
STIMSON
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
17726004
CURRENT_STATUS
01
SITE_LOCATION
2000 STIMSON RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231732_2000 STIMSON_1985-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
573
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Implementation of this monitoring alternative will require <br />Daily Inventory Reconciliation, Annual Tank Integrity <br />Testing, Pipeline Leak Detection, Vadose Zone or Ground Water <br />Monitoring Wells, and Soil Testing. If this monitoring <br />alternative is chosen, implementation should be carried out <br />as follows: <br />1) Perform the initial tank integrity test/tests to confirm that <br />the tank/tanks do/does not leak at the time of implementation <br />of the monitoring alternative. Integrity testing must be <br />done within one year prior to implementation of the <br />monitoring alternative. Based on information obtained from <br />facility personnel all/the tanks/tank at this facility have <br />passed an integrity test within the last year. <br />Vadose Zone Wells <br />2a) Undisturbed soil samples shall be taken from the soil <br />immediately surrounding each/the tank. The boring/borings <br />shall be drilled to a depth of 40 feet and undisturbed soil <br />samples shall be taken at 5 foot intervals with the last <br />sample obtained from the base of the borings. All samples <br />shall be properly sealed, labeled and preserved until they <br />are delivered to a location where they can be analyzed to <br />determine the presence of any possible hazardous substances <br />that are present. Soil sampling and testing shall be carried <br />out as specified in Section 2645 of the Underground Storage <br />Tank Regulations. <br />3a) If the soil samples obtained are determined to be free of <br />hazardous material a vadose zone monitoring well shall be <br />installed in the vacated boring/borings. Vadose zone <br />monitoring wells shall be designed and installed as specified <br />in Sections 2646 and 2648 of the Underground Storage Tank <br />Regulations. Vadose zone testing shall be performed <br />semi-annually, at a minimum. Three types of vadose zone leak <br />detectors, each of which would be acceptable for use at this <br />site are attached at the end of the package. <br />4a) Implementation of this monitoring alternative will require <br />annual calibration of flow meters by the State of California <br />Bureau of Weights and Measures. <br />
The URL can be used to link to this page
Your browser does not support the video tag.