Laserfiche WebLink
TANK # <br /># <br /># # <br /># <br />UST <br />SYSTEM DRAWING INFORMATION <br />coatings or coverings. <br />(1) <br />MANUFACTURER <br />1. <br />_ (2) <br />Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br />i� B. <br />COMPOSITION <br />2. <br />Installation instructions require an air test and soap bubble test prior to installation. <br />Plans drawn to scale in non -erasable print. <br />_ (2) <br />Vacuum applied to interstitial space. <br />_ (3) <br />PRODUCT <br />3. <br />Non -clad steel <br />Plot plan to show location of tanks and all associated piping. <br />4. <br />a' <br />Striker plates or drop tube -mounted bottom protectors illustrated below all accessible openings. <br />5. <br />U.L. LISTED <br />Tank cross-sectional diagram. <br />Field installed cathodic protection systems designed and certified as adequate by a <br />6. <br />_ <br />Detail of tank, associated piping, excavation and cover. <br />7. <br />LA <br />Tank(s) and piping approved by a nationally recognized independent testing organization. [Tide 23, <br />Chapter 16, <br />Article 3, Section 2631 (b) & 26353 <br />8. <br />verification of product compatibility with the tank(s), piping, monitoring <br />device(s), epoxy or silicone glues, etc. <br />9. <br />_ <br />Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br />10. <br />✓/ <br />At the installation site, prior to installation, a tightness test shall be performed on both primary <br />(10) and <br />secondary (20) containment systems before covering. CSection 2635 (a) (3) & (4)] <br />11. <br />Tank integrity test required upon completion of installation with tank in operating condition. Test <br />results to be <br />submitted directly to PHS-EHD from the testing company or owner of facility. [Health & Safety Code, <br />Division 20, <br />Chapter 6.7, Section 25291 (h)] <br />1P_ <br />TANK COMPOSITION <br />TANK # <br /># <br /># # <br /># <br /># <br />CAPACITY <br />coatings or coverings. <br />(1) <br />MANUFACTURER <br />_ (2) <br />Vacuum applied to interstitial space. <br />i� B. <br />COMPOSITION <br />_ (1) <br />Installation instructions require an air test and soap bubble test prior to installation. <br />MODEL <br />_ (2) <br />Vacuum applied to interstitial space. <br />_ (3) <br />PRODUCT <br />C. <br />Non -clad steel <br />tank [Section 2635 (a) (2) (A)] <br />CORROSION PROTECTION <br />Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />U.L. LISTED <br />(2) <br />Field installed cathodic protection systems designed and certified as adequate by a <br />_ <br />COMPATIBILITY WITH 100% <br />METHANOL <br />_ (3) <br />Impressed current systems to be inspected no less than every 60 days. <br />13. TANK(s) TO BE <br />INSTALLED <br />A. <br />Steel -clad with <br />fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br />coatings or coverings. <br />(1) <br />Tested at the installation site using an electric resistance holiday detector. <br />_ (2) <br />Vacuum applied to interstitial space. <br />i� B. <br />Fiberglass <br />_ (1) <br />Installation instructions require an air test and soap bubble test prior to installation. <br />_ (2) <br />Vacuum applied to interstitial space. <br />_ (3) <br />Hydrostatic annular (primary tank pressure test). <br />C. <br />Non -clad steel <br />tank [Section 2635 (a) (2) (A)] <br />_ (1) <br />Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />(2) <br />Field installed cathodic protection systems designed and certified as adequate by a <br />_ <br />corrosion specialist. <br />_ (3) <br />Impressed current systems to be inspected no less than every 60 days. <br />5 <br />