Laserfiche WebLink
9. <br />STOCKTON AASF TANK REMOVAL PROJECT <br />77' <br />1 <br />REMOVE <br />- 2 ea. 20,0000 gal tanks <br />- Tank piping,pump,filter,meter & <br />hose reel assy. <br />- 10 ea. 4" guard posts <br />- 20' light pole <br />- 40' asphalt curbing <br />U <br />V' Guard Posts <br />Asphalt Curbing <br />Light Pole <br />ADD <br />.r <br />- 6,000 sq. ft. asphalt paving with <br />following specifications: <br />41/ AC over 8" base course <br />Remove all adobe clay <br />(avg depth in area 3.4') <br />Prime coat base course <br />Heavily compact backfill over tank <br />removal area <br />NOTE: THE TANK AREA COMPRISES APPROX. <br />3,600 SQ. FT. OF THE 6,000 SQ. FT. <br />TO BE ASPHALTED. ASSUMING THE TANK <br />AREA HAS NO CLAY SOIL, THAT LEAVES <br />APPROX. 2,350 SQ. FT. WHERE CLAY <br />MAY EXIST AND NEED TO BE REMOVED <br />PRIOR TO BACKFILL. <br />