My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STIMSON
>
2000
>
2300 - Underground Storage Tank Program
>
PR0231732
>
COMPLIANCE INFO_1985-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2024 4:16:30 PM
Creation date
6/3/2020 9:51:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1998
RECORD_ID
PR0231732
PE
2361
FACILITY_ID
FA0003648
FACILITY_NAME
STKN ARMY AVIATION SUPP FACILITY*
STREET_NUMBER
2000
STREET_NAME
STIMSON
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
17726004
CURRENT_STATUS
01
SITE_LOCATION
2000 STIMSON RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231732_2000 STIMSON_1985-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
573
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Health and Safety Plan <br />Petroleum Related UST Removal <br />9. Tank Removal and inspection. <br />This task requires the use of heavy equipment such as backhoe, excavators, or cranes to remove the <br />tank from the ground and inspection of the tank. <br />10. Tank . De54ew -ldo., — F;bc�y/mss T4•►�1 <br />de'S°>it`yi w j <br />@1Xc4v44*e b&cke-f am 104 1/1'"J ,'�fo PnW,1., _r roe Wise O.Sdc/, <br />This task involves ewft4AWthb tank with a <br />II. Loading tanks onto vehicles. <br />This task includes the transfer of the tank from the site to the transport vehicle and securing the tank <br />prior to shipment off-site. <br />12 Management of containers. <br />This task includes instances which require the use of containers to contain product / waste and its <br />mixtures removed from the tank (refer to task #6). <br />13. Soil / ground water sampling. <br />This task involves removing a small quantity of soil from the sides and / or bottom of the excavation or <br />ground water, if encountered (as directed by the local regulatory agency) for the purpose of obtaining a <br />sample for shipment to an certified laboratory off-site to confirm or deny the presence of petroleum <br />contamination. <br />14. Site Security. <br />This task involves the need to assemble a barrier to control access to the excavation site should the <br />project exceed a workday. <br />15. Back fill excavation / site restoration / resurface area. <br />This task employs the use of heavy equipment and hand tools to back fill the excavation, restore the <br />site, or resurface the area. <br />16. Personnel / Equipment Decontamination. <br />This task requires personnel egressing from the Exclusion Zone to proceed through the Contamination <br />Reduction Zone prior to entering the Support Zone. For further information <br />regarding decontamination may be found in Section N. <br />17. Site breakdown. <br />This task involves the breakdown of the work area and loading of equipment onto vehicles, <br />
The URL can be used to link to this page
Your browser does not support the video tag.