Laserfiche WebLink
S WRCB,January 2002 Page 2-.of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: iping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Speck) <br /> Test Method Used: ensure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: res; ,,,,e 6.0,w jA l-)5zrPw Equipment Resolution: 7?d — ► 5S-x <br /> Piping Run# Piping Run# Piping Run# Piping Run# <br /> Piping Material: '?ci <br /> Piping Manufacturer: Tbk I C"p i <br /> Piping Diameter: t} <br /> Length of Piping Run: IP-1-0 e, z5 <br /> Product Stored: (&.e,4 u i.&v- <br /> Method and location of ic$4-}„.,ej-'�-eA 4- <br /> piping-run <br /> - <br /> i in -run isolation: 14rp 14 v p► P"�U , <br /> between applying <br /> ressure acuum/water and <br /> st i �test: i 5 -m r H.4 e 5 <br /> Test Start Time: Z '. 30 <br /> Initial Reading(RD: 5 PS.Z <br /> Test End Time: -30 <br /> Final Reading(RF): S 47-7 <br /> Test Duration: u 30 <br /> Change in Reading(RF-RI): S <br /> Pass/Fail Threshold or <br /> Criteria: ob Loss S-7 <br /> Test Result: zPass ❑Fail 6 Pass ❑Fail ❑ Pass 0 Fail 0 Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />