My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3032
>
2300 - Underground Storage Tank Program
>
PR0231758
>
COMPLIANCE INFO_1996-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:32:29 PM
Creation date
6/3/2020 9:52:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2006
RECORD_ID
PR0231758
PE
2361
FACILITY_ID
FA0002127
FACILITY_NAME
WESTERN FOOD & FUEL
STREET_NUMBER
3032
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3032 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231758_3032 E WATERLOO_1996-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tek screw repair boot to sump wall. Cover heads of Tek screws with bonder Fill with DBF it until fill <br /> Wipe off excess bonder. exits vent. Allow <br /> Clamp Rerpair Boot to SP4500 Ducting. sufficient time for all air <br /> to exit fitting. .., <br /> — <br /> nw <br /> j � <br /> RA <br /> 'k.- <br /> Repair boot will conform � �� <br /> to round sumps. w . <br /> Select boot for appropriate pipe. Wrap repair reducer around pipe and Remove clamp over SP4500 Ducting, <br /> solvent weld with Zip-Tice then solvent weld reducer to <br /> RZ 4.9 x 3.5 for repair boot, install clamps over <br /> PP 2500 series pipe SP4500 duct& primary pipe. <br /> r - <br /> RZ4.9x3.0for <br /> SP&VP 2501 series t <br /> piped <br /> 4 <br /> RZ4.9x2.4for f M . <br /> PP 1500 series pipe A <br /> PI <br /> Split terminating boot <br /> available with optional ai <br /> test valve (-A) or test & <br /> drain tube (-D) <br /> PRODUCTS NEEDED INSTALLATION EQUIPMENT NEEDED <br /> RBK 12 -4.5 Repair Kit DAG Applicator Gun <br /> RZ 4.9 x Repair Boot (see above panel) RBIK Installation Kit(Which Includes:) <br /> DBB III Bonder(16 oz) <br /> ADDITIONAL OPTIONS FOR RZ REPAIR BOOTS DBF li Fill (42 oz) <br /> Air Test Valve Add -A to part# DBC Aerosol Cleaner(16 oz) <br /> Test& Drain Tube Add -D to part# DGK Zip-Tite (4 oz) <br /> ERA Adaptor to Test Kit(1/8" barb) Gloves& Static mixers <br /> 54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.