My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3032
>
2300 - Underground Storage Tank Program
>
PR0231758
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2023 2:52:05 PM
Creation date
6/3/2020 9:52:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231758
PE
2361
FACILITY_ID
FA0002127
FACILITY_NAME
WESTERN FOOD & FUEL
STREET_NUMBER
3032
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3032 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231758_3032 E WATERLOO_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
532
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ift 11, V7 <br /> VIDFRGROUND STORAGE TANK <br /> S ONS TL -PAGE 1 One formper 41016 <br /> Ro 1. <br /> TYPE OF ACTION ❑ 1.NEW PLAN 2.CHANGE OF INFOIATION V A <br /> I. FACIL INFORMATION _ <br /> FACILITY ID# (Agency Use Only) ®0 d 2.1 :LL -TTlo b l Z 11 I t. <br /> 3. <br /> BUSINESS NAME(Same as FACILITY NAME) <br /> BUSINESS SITE ADDRESS 103. BUSINESS SITE CITY __1M <br /> 30 <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST system and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan(HMBP). <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely rcraiove <br /> remaining hazardous material from the UST system. <br /> A Any release to secondary containment will be pumped or otneiwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the Hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be malntged as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 funds that <br /> it is non-hazardous. Used absorbent material,reusable or waste,will be stored in a properly labeled and s container. Waste material shall be disposed of <br /> appropriately. <br /> • Facility personnel will determine whether any water removed from secondary containment systems, or from clean up activity,has been in contact with any <br /> hazardous material. If the water is contaminated,it will be managed as hazardous waste unless a hazardous waste determination in accordance with 22(A,R <br /> §66262.11 finds that it is non-hazardous. If the water has ar petroleum sheen(i.e.,rainbow color:;),it is contaminated. A thick floating petroleum layer nta� not <br /> necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> • We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary contains t bs not compatible with the material used for secondary containment; t <br /> 2. Secondary containment is prone to damage from any equipment used to renwve or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material,other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. _ I <br /> III. SPILL COM'_ OL AND.CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE:Spill control and clean-up equipment kept permaneady an-site is listed in the ftcility's Hazardous Materials Business Plan.. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Detective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE BUT AVAILABLE FOR USE IF NEEDED: ly if applicable) <br /> EQUIPMENT LOCATION _ AVAILABILITY �` _ <br /> QJ i <br /> RIO. �g �^' � �g+»� YA0.�R20. f q® ' /tom-�y'��/2 �� - 130.�` Z71 131. <br /> rib l� 0 Rll. <br /> R12. R22. IJ2. <br /> R13. R23. _ 1133. <br /> IL-14. 134. <br /> RIS. R25. _.__. 135. <br /> IV. RESPONSIBLE PERSONS _ <br /> THE FOLLOWING PERSONS)ISIARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME R40, TITLE <br /> Vit # // `� l --- <br /> NAME �_ Rat. `TITLE <br /> NAME RA2 'TITLE <br /> TITLE _ 853. <br /> NAME R43. <br /> V. MONITORING INDICATORS <br /> _ <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEA TSES�, EPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: t60 <br /> ❑1. ADDITIONAL SYSTEM TESTING OR DATA COLLECTION ❑2. INSPECTION BY QUALIFIED PERSONS [33. RECALIBRATION OF EQUIPMENT <br /> A61. <br /> ❑99. OTHER(Specify). <br /> UN-022B-113 www.unidoes.org Rev,04/42AS <br />
The URL can be used to link to this page
Your browser does not support the video tag.