Laserfiche WebLink
SV,TRCB,January 2002 4CEIVE[Age of <br /> 5. SECONDARY PIPE TESTING A�, I <br /> Test Method Developed By: Piping Manufacturer X Industry Standard -Pro eqsional Engineer <br /> Other(Specify) <br /> Test Method Used: X Pressure Vacuum <br /> NT <br /> Other(Specify) H <br /> Test"Equipment Used: F I Equipment Resolution: <br /> Piping Run#87 Piping Run#91 Piping Run#Diesel Piping Run# <br /> Pip- g M 1_ <br /> Piping Material: Corrugated Corrugated <br /> P. c r. <br /> Piping Manufacturer: <br /> Piping Diameter: 4)1_ 4" V <br /> Length of Piping Run: 60' 60' 60' <br /> Product Stored: 87 91 Diesel <br /> Method and location of Dispense to sump Dispense to sump Dispense to sump <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> startintest: <br /> Test Start Time: 9:00 9:00 9:00 <br /> Initial Reading(Rj): 5PSI 5PSI 5PSI <br /> Test End Time: 11:00 11:00 11:00 <br /> Final Reading(Rr): 5PSI 5PSI 5PSI <br /> Test Duration: 2hr 2hr 2hr <br /> Change in Reading(RF-R,): 0 0 0 <br /> Pass/Fail Threshold or Pass Pass Pass <br /> Criteria: <br /> Test Result: X Pass 0 Fall, X Pass 0 Fail X Pass 0 Fail 0 Pass 0 Fall, <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />