My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
5611
>
2300 - Underground Storage Tank Program
>
PR0231764
>
COMPLIANCE INFO_1996-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 4:13:37 AM
Creation date
6/3/2020 9:52:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2002
RECORD_ID
PR0231764
PE
2361
FACILITY_ID
FA0002160
FACILITY_NAME
BlackHawk Petroleum Inc.
STREET_NUMBER
5611
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710052
CURRENT_STATUS
01
SITE_LOCATION
5611 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231764_5611 E WATERLOO_1996-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WR=N MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONTTORING PROGRAM <br /> This monitoring program must be hpt at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating permit. The permit holder must notify San.Joaquin County <br /> Environmental Health Division.phone (209) 468-3420 within 30 days of any changes to the monitoring <br /> procedures, unless required to obtain approval before maldug the change. <br /> Rquaed by SectionR <br /> Sections 2632(d) and 2641(h) CC <br /> ep <br /> Facility Name OkL ojS uaCi-� Ai-7y <br /> Facility Address 2L// L-. P b of /(7 <br /> A Describe th frequencyof perfo g the monitoring: <br /> Tank c �tiU4� v ✓ <br /> Piping Pre&sa a v ,e <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring: <br /> Tank '4Cc ©i-I <br /> Piping P-W AZ -&t <br /> C. Describe the locaticn(s) where the monitoring will be performed (facility plot plan <br /> should be attached): <br /> D. List the name(s) and dde(s) of the people responsfole for performing the monitoring <br /> and/or maintaining :he equipment: <br /> E. Reporting format fcr monitoring: <br /> Tank ✓ "Ovl a stn ` <br /> Piping Tj!&wy " 4 <br /> F. Describe the prevezdve maintenance schedule for the monitoring equipment Note: <br /> Maintenance must be in accordance with the manufacturers-, maintenance schedule <br /> but not less than every L months- JZe !�Zt g f i. 'Ok C5 k CLOn <br /> & Describe the trairLag necessary for the operation of UST.system, including piping, <br /> and the monitoT <br /> snip e t: V y0 42 <br /> i 3- 'l <br />
The URL can be used to link to this page
Your browser does not support the video tag.