Laserfiche WebLink
IFIED PROGRAM CONSOLIDATED F <br /> + UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- (Page 2 of 2 <br /> VI.UNDER DISPENSER CONTAINMENT (UDC)MONITORING (Checkalr <br /> _ that applhy) <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING P 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490-54a. <br /> ❑ 4.NO DISPENSERS ❑ 99.OTHER(Specify) 490-54b. <br /> LEAK MONITOR MANUFACTURER: ,p ago-ss. MODEL#: a96-56 <br /> LEAK SENSOR MANUFACTURER: \ 490-57. MODEL#(S): rJ 490-58. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES b.NO 490-59. <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES b.NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a YES r b.NO 490.61. <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. �a.YES ❑ b.NO 490-62. <br /> ....___...__ ___ ._.... .-.. -... . . .__....._ ....-........................._ ........... _._...._.... ............. ._ ......_._. .- .........__ ..._.._._. .._...._.... ....... ......................._.. ... <br /> UDC CONSTRUCTION IS: 1.SINGLE WALL ❑ 2.DOUBLE WALL 490-63. <br /> IF DOUBLE WALL: 490-64a. <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a YES ❑ b.NO 490-64b. <br /> VII. PERIODIC SYSTEM TESTING <br /> 1.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LLaK DE E TI N ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS RE UIRED.123 CCR§260-0-.11 <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66. <br /> ® 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490-67. <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenance records are kept for this facility: 490-68. <br /> a ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS c.TANK INTEGRITY TESTING RESULTS <br /> d.SIR TESTING RESULTS(and supporting documentation records) e.TANK GAUGING RESULTS(and supporting documentation records) <br /> f.ATG TESTING RESULTS(and supporting documentation records) g.CORROSION PROTECTION 60-DAY LOGS <br /> h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: 490.69x. <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490.69b. <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 49"9c. <br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490.69d. <br /> CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e. <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 490-69x. <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490-69& <br /> El OTHER(Specify): 490-69h. <br /> . <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council 490-70. <br /> (ICC). The "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide addition I co men ,here or ind' a how many es with additio al information on specific monitoring procedur are attached to this pl -- 490-71. <br /> r , / fir ` � � f s a ,. V�ca?V l2 <br /> XI. PERSONNEL RESPONSIMLITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> by this plan occurs,2_)all conditions that indicate a possible release are investigated,and 3.)all monitoring records are maintained properly <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: s� ✓t �.� ( S /)1 f7 490-72. TITLE .�� Y B/s�t! 490-73. <br /> NAME: t't NIl rjl�ri 490-74. TITLE: 490-75. <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE DATE: 490-77. <br /> REPRESENTING:E3 1.Tank Owner/Operator E3 2.Facility Owner/Operator 3.Authod;Wlkeprcs tative downer 490-76. J <br /> APPLICANT NAME(print): t 490-78. APPLICANT TITLE: 490-79. <br /> La <br /> UPCF UST-D(12/2007)-3/4 www.unidocs.org <br />