Laserfiche WebLink
W <br /> UNIFIED PROGRAM CONSOLIDATED FORIW <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54a <br /> 490-541 <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING Rk 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS ❑99.OTHER(Specify): <br /> PANEL MANUFACTURER: 49°55 MODEL#: 490.56. <br /> LEAK SENSOR MANUFACTURER —17 MODEL#(S): 490-59 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a.YES 9b.NO 496'59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES 13 b.NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ab.NO 49MI <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER L a YES ❑b.NO 49062 <br /> 2.UDC CONSTRUCTION IS Ell.SINGLE-WALLED ❑2.DOUBLE-WALLED 490-63 <br /> IF DOUBLE WALLED: 490.64a <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: 1.LIQUID 2.PRESSURE 13 3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a YES ❑b.NO 490.641 <br /> VII.PERIODIC SYSTEM TESTING <br /> 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 23 CCR 2644.1 <br /> M2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490.66 <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490.67 <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> Alarm logs 490-6aa ❑Visual Inspection Records 490681 ❑Tank integrity testing results 49"sc <br /> ❑SIR testing results(and supporting documentation records). 490-68d ❑ Tank gauging results(and supporting documentation records). 49a6se <br /> ❑ATG Testing results(and supporting documentation records).490.68r ❑ Corrosion Protection 60-day logs 4go-6ag <br /> uipment maintenance and calibration records. 490.68h <br /> IX.TRAINING <br /> ersonnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490.6% <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> (3 THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)49m% <br /> ❑ OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)4go-69c <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-694 <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 49o-6% <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-697 <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490.698 <br /> ❑ OTHER(Specify):M69h.M69i <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> • The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> • Names of contact person(s)for emergencies and monitoring alarms.490-70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.49o-7i <br /> V - 1 S4 1log ( I " ,I f- <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The folio rs n(s are responsibl fo ing the monitoring,an ment maintenance,/ <br /> NAMEAl z ITLE l� 490-73 <br /> NAME 490-74 TITLE 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION: rtifY tha the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE 490-76 DATE: 490.77 <br /> RFPRFCFNTIN/•r f 11.Tank Owner/Operator 0?Facility Ownaffia ator ❑3.Authorized Representative of Owner <br /> APPLICA <br /> NTN F(print): _ / 490-79 APPLICANT TIT490'79 <br /> UPCF UST-D(12/2007)3/4 <br />