My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1984-1994
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3300
>
2300 - Underground Storage Tank Program
>
PR0231765
>
COMPLIANCE INFO_1984-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2023 4:08:11 PM
Creation date
6/3/2020 9:52:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1984-1994
RECORD_ID
PR0231765
PE
2361
FACILITY_ID
FA0003600
FACILITY_NAME
Nella Oil #427
STREET_NUMBER
3300
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3300 Waterloo Rd
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231765_3300 WATERLOO_1984-1994.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
401
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WESTERN AMERICA TANK TESTING, INC. <br />3131 Fairhaven Drive <br />Bakersfield, CA 93308 <br />(805) 322-9827 <br />ANNUAL 3 -STEP RED JACKET LEAK DETECTOR TEST <br />OWNER ULTRAMAR. INC. <br />LOCATION Stockton, CA. #610 <br />DATE <br />11/21/90 <br />PRODUCT: <br />Regular, Unleaded, <br />Premium Unleaded, <br />Diesel <br />(Circle one) <br />NOTE: Use separate form for each Tank. <br />(l) <br />Running Pressure 25 <br />(2) Shut -Off Pressure <br />20 <br />(3) <br />Amount of Product Released <br />thru Bibcock to Zero <br />1 oz. <br />(4) <br />With Valve Open --Start: STP <br />- List: Pressure <br />1.4 <br />P.S.I., <br />(5) <br />Reduce Flow to Rate of 7 <br />oz. per Minute - List <br />Pressure <br />at this Flow <br />Rate 20 P.S.T., <br />(6) Turn STP Off - Let Pressure drop to zero thru Leak just: created - List <br />time for Gauge to Reach Zero min. 2 sec., <br />(7) Turn the STP back on - Keep Leak Rate at Bibcock - List. pressure <br />20 P.S.I. - Flow Rate at Nozzle 1/2 G.P.M., <br />(8) Stop Leak with STP still on - Does Leak Detector reset X yes no <br />If yes - How long to reset min 2 sec., <br />(9) Turn STP off - List pressure 18 P.S.I., <br />(10) Turn STP back on - List time to reach pressure rise min. 2 sec. <br />(11) List Pressure 25 P.S.I., <br />(12) Open Nozzle and List Pressure 25 P.S.I. <br />SATISFACTORY LEAK DETECTOR X Yes <br />LEAK DETECTOR <br />Model Red Jacket , Date Code & Serial # <br />
The URL can be used to link to this page
Your browser does not support the video tag.