Laserfiche WebLink
0 0 <br />SECONDARY <br />PIPE TESTING <br />Me hdc� .: <br />O Manufacturee <br />♦ tni vo Stap�d€asd:., <br />C� #�rafb$signal.f rigr €3. U#her (see bell <br />TS ! tfidC� uses <br />#� Exressrase <br />Vacut7m <br />;.:.. <br />Q Hyi riasfatic . q Qther,(se ielwnr) <br />I�li.'�SLCYCi{1L�r[TCIE:C1 SCSUr <br />Gaup <br />{r�ngeot4ia <br />. . <br />.i airs # <br />Pi in ;Run<#3': . <br />Pipe Manufacturer <br />Smith <br />Smith <br />Smith <br />Pipe Type <br />FRP.......FRP <br />FRP <br />Primary Pipe Diameter (inches) <br />2" <br />2" <br />2" <br />Secondary Pipe Diameter inches <br />( ) <br />3" <br />3" <br />3" <br />Product Stored <br />Gasoline - 87 <br />Gasoline - 89 <br />Diesel <br />Method of secondary pipe isolation <br />rY P P <br />Termination Boot <br />Termination <br />nation Boot <br />Termination Boot <br />Location of secondary Pi e isolation <br />SumPSumP <br />Sump <br />Estimated length of piping run feet <br />70' <br />70' <br />(include length of branch runs) <br />Wait time for pressure to stabilize (hr:min <br />0:11 <br />0:08 <br />0:21 <br />Test start time <br />9:12 AM <br />9:18 AM <br />9:11 AM <br />Initial pressure (psig) <br />5 <br />5 <br />5 <br />Test end time <br />10:12 AM <br />10:18 AM <br />10:11 AM <br />Final pressure (psig) <br />5 <br />5 <br />5 <br />Test duration hours:minutes <br />( ) <br />1:00 <br />1:00 <br />`:>> 1:00 <br />Change in pressure (psig) <br />0 <br />0 <br />0 <br />Pass/Fail threshold (psig) <br />0.5 <br />0.5 <br />0.5 <br />TEST RESULT <br />PASS <br />PASS <br />Plass <br />Comments: <br />0 2002 Walton Engineering, Inc. <br />