Laserfiche WebLink
MONITC*ING SYSTEM CERTIRVATION <br />CERTIFICATION /TEST DATE: December 10, 2010 <br />Al. FACILITY <br />YesElNo* <br />❑ <br />A2. OWNER <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />Name <br />Olympian # 427 <br />❑ <br />Name <br />Nella Oil Company, LLC <br />Address <br />3300 Waterloo Road, Stockton, CA 95205 <br />ElNo* <br />Address <br />2360 Lindbergh Street, Auburn, CA 95602 <br />Phone # <br />530-885-0401 <br />❑ <br />Phone # <br />530-885-0401 <br />Contact <br />Amanda Appelt <br />❑ <br />Contact <br />Amanda Appelt <br />F. IN -TANK GAUGING / SIR EQUIPMENT: <br />❑ Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gaugung equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ <br />YesElNo* <br />❑ <br />No * <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />ElYes <br />❑ <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />El <br />Yes <br />ElNo* <br />No * <br />Was accuracy of system product level readings tested? <br />❑ <br />Yes <br />❑ <br />No * <br />Was accuracy of system water level readings tested? <br />❑ <br />Yes <br />❑ <br />No* <br />Were all probes reinstalled properly? <br />❑ <br />Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />G. LINE LEAK DETECTORS (LLD): <br />Complete the following checklist: <br />❑ Check this box if LLDs are not installed. <br />❑ <br />Yes <br />❑ <br />No * <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑ <br />N/A <br />(check all that apply) Simulated leak rate: ■ 3 g.p.h.; ❑ 0.1 g.p.h.; ❑ 0.2 g.p.h. <br />❑ <br />Yes <br />❑ <br />No * <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />❑ <br />Yes <br />❑ <br />No* <br />Was the testing apparatus properly calibrated? <br />❑ <br />Yes <br />❑ <br />No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ <br />N/A <br />❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ <br />N/A <br />❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />❑ <br />N/A <br />or disconnected? <br />❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />❑ <br />N/A <br />or fails a test? <br />❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />❑ <br />N/A <br />❑ <br />Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />H. COMMENTS <br />Page 3 of 3 <br />