My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3300
>
2300 - Underground Storage Tank Program
>
PR0231765
>
COMPLIANCE INFO_2007-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2023 4:22:53 PM
Creation date
6/3/2020 9:52:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2010
RECORD_ID
PR0231765
PE
2361
FACILITY_ID
FA0003600
FACILITY_NAME
Nella Oil #427
STREET_NUMBER
3300
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3300 Waterloo Rd
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231765_3300 WATERLOO_2007-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
388
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
US ■ SYSTEM ■ mETf RFI f OR ■ IEPAI <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br />1. Site map enclosed? YES [$ NO [] <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br />adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review): <br />Sawcut remove, and dispose, of concrete adjacent to the failed diesel <br />Excavate as required to expose SC, spoils to be stored onsite. Remove & <br />dispose SC, install <br />replacement like for <br />like OPW SC. <br />Perform <br />hydrostatic <br />test with Inspector <br />prior to backfill. <br />Backfill using <br />spoils <br />& install <br />new concrete to match existing with #4 rebar. <br />Replace the sensors in the 87, Die, & Red Die UST annulars, using <br />like for like Veeder-Root 420 sensors. <br />Perform final testing on all components and provide final reports to <br />Agency and Owner. <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />(1) OPW 1C-2100C-DEVR fill spill container <br />(3) Veeder-Root 794390-420 Interstitial Sensor <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.