My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3300
>
2300 - Underground Storage Tank Program
>
PR0231765
>
COMPLIANCE INFO_2011-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2023 4:27:40 PM
Creation date
6/3/2020 9:52:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2016
RECORD_ID
PR0231765
PE
2361
FACILITY_ID
FA0003600
FACILITY_NAME
Nella Oil #427
STREET_NUMBER
3300
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3300 Waterloo Rd
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231765_3300 WATERLOO_2011-2016.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank Monitorin —Page 2 of 2 <br /> VI. DISPENSER MONITORING <br /> MONITORING OF AREAS BENEATH DISPENSER(S)IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT(UDC) <br /> Msz <br /> PANEL_MANUFACTURER: Mst. MODEL#: <br /> LEAK SENSOR MANUFACTURER: M53 MODEL#(S): M54_ <br /> WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? ❑ a.YES ❑ b.NO M55. <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M56, <br /> WILL,FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO <br /> nasi. <br /> ® 2.MECHANICAL,ASSEMBLY(e.g.,FLOAT AND CHAIN ASSEMBLY)IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br /> - M59. <br /> ASSEMBLY MANUFACTURER:Bravo M58. MODEL#(S): <br /> M60 <br /> ❑ 3.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Requires agency approval) <br /> ❑ 4.NO DISPENSERS <br /> M61. <br /> ❑ 99.OTHER(Specify) <br /> VII. ENHANCED LEAK DETECTION <br /> ❑ 1.WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK M70 <br /> DETECTION(ELD)FOR THE UST(S)COVERED BY THIS PLAN.PER 23 CCR§2644.1,ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br /> VIII. TRAINING <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) M80. <br /> I. ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 2. ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) <br /> 3. ® THE FACILITY'S BEST MANAGEMENT PRACTICES(Required as of January 1,2005) <br /> 4. ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> 7. ❑ SWRCB PUBLICATION:"WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br /> M81. <br /> 99. ❑ OTHER(Specify): <br /> Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant to their job duties and can access those documents when needed. <br /> By January 1,2005,this facility will have a"Designated UST Operator"who has passed the California UST Sytem Operator Exam administered by the International <br /> Code Council(ICC). By July 1,2005,and annually thereafter,the "Designated UST Operator"will train facility employees in the proper operation and maintenance <br /> of the UST systems.This training will include,but is not limited to,the following: <br /> Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> The facility employee's role with regard to the leak detection equipment. <br /> The facility employee's role with regard to spills and overfills. <br /> Whom to contact for emergencies and leak detection alarms. <br /> For facility employees hired on or after July 1,2005,the initial training will be conducted within 30 days of the date of hire. <br /> IX. COMMENTS/ADDITIONAL INFORMATION <br /> Please use this section to include any additional UST system monitoring-related information(e.g.,additional information required by your local agency): M85 <br /> Note regarding Section X.Pending certification of a Designated UST Operator,the following person has authority for performing the monitoring <br /> activities and maintaining leak detection equipment covered by this plan. NAME: JOB TITLE: <br /> The overfill prevention is a flapper valve set to shut off at 95% <br /> X. PERSONNEL RESPONSIBILITIES <br /> AS OF JANUARY 1, 2005, THE "DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT <br /> APPLICATION — FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING <br /> LEAK DETECTION EQUIPMENT COVERED BY THIS PLAN,AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS <br /> OF THE FACILE"rY'S UST SYSTEMS IN ACCORDANCE WITH 23 CCR§2715(b). <br /> XI. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION: I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> OWNE ERATO SIGNATURE REPRESENTING DATE: M9i <br /> ❑Owner M9o. <br /> E Operator December 19, 2009 <br /> M9z. OWNER/OPERATOR TITLE: nag} <br /> ER/O RATOR N ME(print): <br /> Don Barley Environmental Compliance Specialist <br /> (Agency Use Only) This plan has been reviewed and: ❑Approved ❑Approved With Conditions ❑Disapproved <br /> Local Agency Signature: Date: <br /> Comments/Special Conditions: <br />
The URL can be used to link to this page
Your browser does not support the video tag.