My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3300
>
2300 - Underground Storage Tank Program
>
PR0231765
>
COMPLIANCE INFO_2011-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2023 4:27:40 PM
Creation date
6/3/2020 9:52:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2016
RECORD_ID
PR0231765
PE
2361
FACILITY_ID
FA0003600
FACILITY_NAME
Nella Oil #427
STREET_NUMBER
3300
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3300 Waterloo Rd
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231765_3300 WATERLOO_2011-2016.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIED PROGRAM CONSOLIDATED FO <br /> UNDERGROUND STORAGE TANK <br /> CERTIFICATION OF INSTALLATION/ MODIFICATION <br /> (One form per project.) <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1 -7 <br /> BUSINESS NAME(Same as FACILUY NAME or DBA—Doing Business As) 3. <br /> Nella #427 Cardl-ock <br /> BUSINESS SITE ADDRESS 103. CITY 104. <br /> 3300 Waterloo Road Stockton <br /> II. INSTALLATION/MODIFICATION PROJECT DESCRIPTION <br /> TYPE OF PROJECT(Check all that annly) 483a. WORK AUTHORIZED UNDER PERMIT 483b. <br /> X 1.TANK INSTALLATION OR REPLACEMENT (Number or Date): <br /> ❑ 2.PIPING INSTALLATION OR REPLACEMENT <br /> ❑ 3.SUMP INSTALLATION OR REPLACEMENT S R0061572 <br /> ❑ 4.UNDER DISPENSER CONTAINMENT INSTALLATION OR REPLACEMENT <br /> ❑ <br /> 5.OTHER <br /> DESCRIPTION OF WORK BEING CERTIFIED: 4830 <br /> Replacement of the diesel OPW spill container <br /> III. CONTRACTOR INFORMATION <br /> NAME OF CONTRACTOR WHO PERFORMED INSTALLATION/MODIFICATION 482x. <br /> Walton Engineering, Inc. <br /> CONTRACTOR LICENSE# 481. ICC CERTIFICATION# 4820. <br /> 617238 50�--`i S $ <br /> IV.CERTIFICATION <br /> I certify that the information provided herein is true,accurate,and that the following conditions have been satisfied: <br /> • The installer has met the requirements set forth in 23 CCR§2715,subdivisions(g)and(h). <br /> • The underground storage tank, any primary piping, and any secondary containment was installed according to applicable <br /> voluntary consensus standards and any manufacturer's written installation instructions. <br /> • All work listed in the manufacturer's installation checklist has been completed. <br /> • The installation has been inspected and approved by the local agency, or if required by the local agency, inspected and certified <br /> by a registered professional engineer having education and ex erience with underground Storaa tank S Stem installations. <br /> SIGNATURE OF TAN R OR OWNER'S AGENT DATE 484. PHONE 487. <br /> 12 _ Z o_ i o (916) 372-1888 <br /> C IER'S N (print) 485 CERTIFIER'S TITLE: 486. <br /> _� Contractor <br /> NAME OF CERTIFIER'S EMPLOYER(DBA) 488 CERTIFIER'S RELATIONSHIP TO TANK OWNER 489. <br /> Walton Engineering, Inc. ❑ 1.TANK OWNER ❑ 2.TANK OPERATOR <br /> ❑ 3.CONTRACTOR ❑ 4.PROPERTY OWNER <br /> X 5.OTHER AUTHORIZED AGENT OF TANK OWNER <br /> UPCF UST-C-1/2 Rev.(12/2007) <br />
The URL can be used to link to this page
Your browser does not support the video tag.