Laserfiche WebLink
A KNOLOG <br />Mr <br />' TEC HNOLOGYFORTANKS <br />AND THEIR ENVIRONMENT <br />Owner CHEVRON USA PRODUCTS CO. <br />Invoice Name/Address CHEVRON USA PRODUCTS CO. <br />Site Name/Address CHEVRON USA PRODUCTS CO. <br />VacuTecfm TEST REPORT <br />Site # 99840 <br />ACCOUNTS PAYABLE SECTION P.O. BOX 5004 <br />4400 WATERLOO ROAD STOCKTON, CA <br />S.O. # <br />Date <br />Phone <br />SAN RAMON, CA 9458.3 <br />Attn: <br />090848 <br />07/01/93 <br /><510> 842-9624 <br />MARGE FARRAR <br />TANKS <br />LINES <br />Leak Det <br />See <br />Diag. <br />For <br />c' <br />Tank <br />Dia. & <br />Material <br />ST/ <br />Dipped <br />Water <br />Level <br />■ <br />Dipped Probe <br />Product Water <br />Level Level <br />■ ■ <br />Ullage <br />Water Bubble Air <br />Ingress Ingress Ingress TANK <br />Detected Detected Detected ■ <br />■ 111111 Tight <br />Line <br />Material <br />■ <br />Line <br />Delivery <br />Syst. Type <br />■ <br />LINE <br />TEST <br />■ <br />LINE <br />TEST <br />■ <br />Final <br />Leak <br />Rate <br />■ <br />LINE <br />■ <br />Tight <br />Exist <br />LD(s) <br />Pass/ <br />Fail/ <br />NEW <br />LD(s) <br />Tested <br />TANKS and LINES Tested to CFR -40 Parts <br />280-281 & NFPA 329 Spec's. <br />Other: <br />k <br /># <br />Tank <br />Product <br />Tank <br />Capacity <br />FRP/ <br />Lined <br />START <br />END <br />START START <br />END END <br />or <br />Yes/No Yes/No Yes/No Fail <br />Line # <br />ST/ <br />FRP <br />PS/SS/GS <br />START <br />TIME <br />END <br />TIME <br />GPH <br />or <br />Fail <br />or <br />NONE <br />& <br />PASS <br />1 <br />WST <br />100t' <br />Diameter <br />0 , 000 <br />006.00 00,160 <br />N N N T <br />- <br />Exist LO SN/MDL/MFG: <br />O I L <br />45)0 <br />New/2nd LD SN/MDL/MFG: <br />.000 <br />1006.00 00.1601 <br />LINE TEST PSI <br />arena <br />Start Time: 15 : 5 4 Time of Test ll at 13.0 Mfmp <br />FRP <br />Dispenser <br />serateeres/naor Valves <br />En Time: I. _ . 8 0 roe FILL Inclinometer er N A <br />7� : 5 6 an/ <br />2 <br />S7UTPR <br />10000Diameter <br />y� �1j � <br />0 083 • 0,0 00 . 160 N N N T <br />vO <br />A <br />r� <br />FRS <br />�+ <br />PS <br />� <br />I s V 6 <br />� <br />1.36 <br />p� <br />0 .000 <br />E� <br />Exist LD SN/MDL/MFG: <br />/000 <br />. 0 O O 1083 O O 00 . 1 6,0 1 <br />TJ N L <br />91 <br />New/2nd LD SN/MDL/MFG: <br />LINE TEST PSI 50.00 <br />atene <br />start Time: 2 0 2 8 Time of Test at 91.0 Mfg`: ED R E D JACKET <br />FRP <br />OpDiserate (Yes/enser no ar Valves <br />End Time: 2 2 3 O T st Psi: — . 9 0 En : FILL Inclinometer Oes: 1 . 0 0 0 <br />3 <br />NO <br />10000 <br />Diameter <br />0.000 084.00 00.1601 N N I N T <br />3A <br />FRP <br />PS <br />1:4 <br />2:16 <br />0.000 <br />V <br />`I <br />Exist LD SN/MDL/MFG: <br />LEAD <br />91310.000 <br />New/2nd LD SN/MDL/MFG: <br />0 8 4. 0 0 00.1601 1 <br />PLUS <br />LINE TEST P51 50.00 <br />Dispenser Shear Valves <br />Operate es/no <br />arena <br />�RP <br />JACKET <br />Start Time: 2 0: 2 8 Time of Test it at 92.01 Mfmp R E D U A CKE T <br />er <br />- an 9 /� ro - T nc Decrees. <br />End Time: 2 2 ..j �. T t P I: ` i v n F r <br />4 <br />REG <br />100 0 0 <br />Diameter <br />)0_000 <br />.0 1074-00", #� G O V N N i <br />! <br />FRP <br />PS <br />,', 44 <br />0:14 <br />0 .O O t <br />N <br />Exist LD SN/MDL/MFG: <br />U N L <br />91-)0.0001074.00 <br />/ T <br />New/2nd LD SN/MDL/MFG: <br />00.160 <br />�� �� <br />LINE TEST PSI 50 . 00 <br />Dispenser Shear Valves <br />Operate es/no <br />Material <br />P K. _' <br />f t <br />Stag Time: 22 : 55 Time of Test: at 81.0 Mfg RED JACKET <br />: 3 6 es I:" L3 0 rn e FILL Inclinometer <br />Time: 1.600 <br />15pEnd <br />lameter <br />Exist LD SN/MDL/MFG: <br />New/2nd LD SN/MDL/MFG: <br />LINE TEST PSI: <br />Dispenser Shear valves <br />O erase es/no <br />arena <br />roeM o I of Pump <br />Start Time: Time of Test: Mfg.: <br />an Probe Inclinometer <br />En Time: T PSI: Ent : D r <br />Diameter <br />Exist LD SN/MDL/MFG: <br />Naw/2nd LD SN/MDL/MFG: <br />LINE TEST PSI <br />Dispenser Shear valves <br />Operate es/no <br />atenaPercent <br />of Fillat Ump <br />Start Time: Time of Test: Mfg.: <br />Tank robe Inclinometer <br />End Time: Test PSI: Entry: Decrees <br />TANKNOLOGY Region: WESTERN REGION Unit # 051 State Lic. # <br />NOTE: Original VacuTect Data recordings are reviewed by Tanknology's Audit Control Department and maintained on file. <br />TAK-01 <br />Tanknology Corporation International <br />State: :"`-. 5225 Hollister St., Houston, TX 77040 <br />(800) 888-8563 9 FAX (713) 690-2255 <br />