Laserfiche WebLink
HAZARDOUS MATERIAL MANAGEMENT PLAN & UST MONITORING PLAN <br />DEALER:_Guy Dahlenburg OWNER: CHEVRON, U.S.A. <br />BUSINESS NAME: Waterloo Chevron P.O.BOX 5004 <br />STREET: 4400 Waterloo Rd SAN RAMON, CA 94583-0804 <br />CITY: Stockton , CA ZIP: 95215 <br />STATION No: 99840 <br />SITE PHONE # 209-931-2186 <br />DUNN & BRADSTREET # 00-138-2555 SIC CODE: 5541 5411 <br />NATURE OF BUSINESS: <br />GASOLINE SALES X AUTO REPAIR X CAR WASH FOOD MART X <br />EXISTING UNDERGROUND TANKS ARE AS FOLLOWS: <br />CONST . SPILL OVERFILL <br />(SW/DW) (YIN) (YIN) <br />SW <br />SW <br />SW <br />WASTE OIL 1 1,000 FG SW <br />PRODUCT LINES: MATERIAL: FG <br />CONSTRUCTION: Single Wall <br />LINE LEAK DETECTION METHOD: ELECTRONIC X MECHANICAL <br />All product lines have line leak detectors capable of detecting a leak of <br />3 gallons or more per hour at 10 lbs. per square inch line pressure <br />within 1 hour; see page one for a description of the equipment installed <br />at this location. <br />All product lines are pressurized using a submerged pumping system and <br />are tested annually to assure the leak detectors are functional.Impact <br />valves are also inspected annually to assure closure. <br />Repair and/or replacement of all leak detectors and impact valves will be <br />done annually at the time of inspection and retested to meet the above <br />test conditions. <br />* This document is to be kept current and at the site. Revision 8, 1991 <br />1 <br />No. of <br />SIZE <br />MATERIAL <br />TANKS <br />(gal) <br />(STL/FG) <br />SUPER UNLEADED <br />1 <br />10,000 <br />FG <br />REGULAR UNLEADED <br />1 <br />10,000 <br />FG <br />LEADED REGULAR <br />1 <br />10,000 <br />FG <br />DIESEL <br />0 <br />CONST . SPILL OVERFILL <br />(SW/DW) (YIN) (YIN) <br />SW <br />SW <br />SW <br />WASTE OIL 1 1,000 FG SW <br />PRODUCT LINES: MATERIAL: FG <br />CONSTRUCTION: Single Wall <br />LINE LEAK DETECTION METHOD: ELECTRONIC X MECHANICAL <br />All product lines have line leak detectors capable of detecting a leak of <br />3 gallons or more per hour at 10 lbs. per square inch line pressure <br />within 1 hour; see page one for a description of the equipment installed <br />at this location. <br />All product lines are pressurized using a submerged pumping system and <br />are tested annually to assure the leak detectors are functional.Impact <br />valves are also inspected annually to assure closure. <br />Repair and/or replacement of all leak detectors and impact valves will be <br />done annually at the time of inspection and retested to meet the above <br />test conditions. <br />* This document is to be kept current and at the site. Revision 8, 1991 <br />1 <br />