Laserfiche WebLink
0 <br />0 <br />5. SECONDARY PIPE TESTING Page 3 of <br />Test Method Developed By: <br />❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: <br />® Pressure <br />❑ Other (Specify) <br />❑ Vacuum <br />❑ Hydrostatic <br />Test Equipment Used: DIAL GAUGE <br />Piping Run # <br />Piping Run #1 <br />Equipment Resolution: 0 to 15" psi <br />Piping Run # Piping Run # <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass Fiberglass <br />Piping Manufacturer: <br />A O rw <br />Piping Diameter: <br />Length of Piping Run: <br />Product Stored: <br />=tea <br />------ <br />- --- <br />Method and location of <br />Method <br />pipm -run isolation: <br />Wait time between applying <br />pressurelvacuum/water and <br />starting test: <br />15 Minutes <br />15 Minutes <br />15 Minutes 15 Minutes <br />Test Start Time: <br />C <br />6 <br />Initial Reading (RD: <br />5 PSI <br />5 <br />PSI <br />5 PSI 5 PSI <br />Test End Time: <br />/ 5 <br />Z <br />Final Reading (RF): <br />-15- PSI <br />1! -' <br />PSI <br />PSI PSI <br />Test Duration: <br />1 Hour <br />1 Hour <br />1 Hour 1 Hour <br />Change in Reading (RF-RO: <br />PSI <br />PSI <br />PSI PSI <br />Pass/Fail Threshold or <br />Criteria: <br />Zero <br />Zero <br />Zero Zero <br />F y �:. <br />i <br />Ell <br />.' ° <br />' x k . .i k ... Y <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Chevron #99840 <br />4344 Waterloo Rd. <br />Stockton, CA. 95215 <br />N04770 - SB 989 Testing <br />