My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4344
>
2300 - Underground Storage Tank Program
>
PR0231766
>
COMPLIANCE INFO_1997-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2023 3:52:47 PM
Creation date
6/3/2020 9:53:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2006
RECORD_ID
PR0231766
PE
2361
FACILITY_ID
FA0003717
FACILITY_NAME
CHEVRON STATION #99840*
STREET_NUMBER
4344
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95215
APN
10102156
CURRENT_STATUS
01
SITE_LOCATION
4344 E Waterloo Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231766_4344 E WATERLOO_1997-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
535
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Instructions for Testing Line Leak Detectors <br />Section G <br />1. Line leak detectors should be tes place,not removed. <br />2. The functional elements of the mechanical LLD are the piston and the diaphragm. To ensure that these elements <br />are functioning properly, the submersible pump can be started and the time that the piston or diaphragm takes to move <br />into position to enable full flow of the product noted. The range of allowable opening times is specified by the manufacturer <br />and is available in the equipment manual. <br />3. The presence of air pockets in the system will result in longer opening times since air is much more compressible than <br />product. <br />4. Thermal expansion and compression may be a problem in areas where there are large temperature variances between <br />day and night. The difference between product temperature and air temperature may be significant enough to create an <br />expansion or contraction as the product is pushed up the line into the LLD. <br />5. The purpose of the relief valve is to ensure that the LLD can function properly and is not damaged by an exessive build-up <br />of pressure behind the piston or diaphragm. If the pressure is exessive, the relief valve will vent into a copper tube that <br />leads back to the tank. The connections to this tubing should be checked for leaks. <br />05/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.