My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4344
>
2300 - Underground Storage Tank Program
>
PR0231766
>
COMPLIANCE INFO_1997-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2023 3:52:47 PM
Creation date
6/3/2020 9:53:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2006
RECORD_ID
PR0231766
PE
2361
FACILITY_ID
FA0003717
FACILITY_NAME
CHEVRON STATION #99840*
STREET_NUMBER
4344
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95215
APN
10102156
CURRENT_STATUS
01
SITE_LOCATION
4344 E Waterloo Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231766_4344 E WATERLOO_1997-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
535
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />C7 <br />MANUAL <br />Another unique FE Pe <br />feature. When nccessi <br />during maintenance t, <br />bleed line pressure to <br />a vent screw is provide <br />By turning this screw, <br />line pressure is divert <br />back to the tank. <br />PRESSURE RELIEF: <br />Reduces fuel discharge into the sump manhole or _ <br />dispenser pan during servicing, further protecting <br />service technicians and the environme:1t. <br />WIRIMMUCAUM <br />The IST uses FE Pecro's <br />proven line check <br />valve. At 2 3/4" in <br />diameter, this valve <br />reduces pressure loss <br />at hic flow rates, - <br />resul:ing in faster <br />fueling times -anal lower <br />power consumption. <br />,.The FE Petro check valve is proven to seal. You <br />:cah avoid purchasing additional check valves <br />when the IST is used with some electronic line <br />'leak detectors because of this proven reliability. <br />SUPERIOR BEARING COOLING: <br />The 1ST uses the <br />excitusive <br />FE Ppvro dooling <br />system. This unique <br />system continually <br />passes over 1 GPM <br />thro4i a fine <br />bronze filter and <br />directly through <br />motor bearings <br />whenever pump is <br />openzing. <br />This system has been designed to extend critical <br />bearing and motor life. <br />11 PRESSURE RELIEF VALVE: <br />The IST pressure relief valve⢠is thc sarric simple <br />valve used for years in our standard <br />submersibles. Factory set to relieve C, <br />at or above pump pressure. <br />This valve- is protected J,a <br />from particles in the <br />fuel by a fine <br />mesh screen. `c <br />By keeping static line pressure as high as <br />possible, mechanical leak detectors make <br />fewer tests, and therefore last longer. <br />The IST uses the <br />standard <br />FE Petro air <br />eliminator, <br />which has a <br />double funcdo:^. <br />as the syphon <br />primer for tank <br />syphon systems. <br />AIR ELIMINATOR: <br />The air eliminator is a one way valve, allowing <br />air to return to the tank, but not re-enter the <br />-piping system. <br />SYPHON CHECK VALVE: <br />Optional for syp::oned tanks. <br />Another time proven performer. 0 <br />The FE Petro syphon check valve can be <br />eapily cleaned in the field. It is not necessary <br />to replace with a new valve if it becomes <br />blocked from panicles in the Reel tanks. <br />
The URL can be used to link to this page
Your browser does not support the video tag.