Laserfiche WebLink
Based on the hazard analysis for this project, the following personal protective equipment (PPE) <br />will be required and used. Changes to these specified items PPE will not be made without the <br />approval of the site safety officer. <br />The PPE for this project will be Level D. Steel -toed boots, and hard hats, will be worn in the <br />work area. Cotton overalls may be worn for dirt protection. Ear plugs and safety glasses will be <br />available. <br />These items do not provide any chemical protection. Nitrite gloves with latex or vinyl liners <br />should be worn when sampling or handling contaminated sods to prevent skin contact with <br />contaminants. if conditions are encountered where any of the constituents listed in Table C-1 are <br />detected at or above the TLV for that chemical, work will cease. Level C ppe will be donned prior <br />to continuing work at the site under such conditions. Level C will include Saranex coveralls, <br />nitrite gloves with liners, and fuliface air -purifying respirators with organic vapor cartridges in <br />addition to the level D items specified above. <br />Medical surveillance is conducted as a routine program which meets the requirements of 29 CFR <br />1910.120 (i). There will not be any special medical tests or examinations required for staff <br />involved in this project. <br />Work Practices: <br />Safe work practices to be employed during the entire progress of field work are as follows: <br />1. Set up, assemble, and check out all equipment for integrity and proper function before <br />entering the work area and prior to starting work activities. <br />2. Do not use faulty or suspect equipment. <br />3. Use only new and intact protective clothing. <br />4. Do not use hands to wipe face. Use a clean towel or paper towels. <br />S. Practice Contamination avoidance at all times. <br />The SS® is trained in first aid and CPR First aid kit and fire extinguisher will be located at the <br />command vehicle. The nearest telephone is located on site and the PM `s truck will also be <br />equipped with a mobile telephone. The emergency telephone numbers to be used to call for <br />assistance are listed in the section on Key Personal and Responsibilities with the reference list of <br />project contacts. <br />