Laserfiche WebLink
SWRCB,January 2002 Page 2. <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes: El <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested: <br /> Test Method Developed By: ❑ Spill Bucket Manufacturer ❑Industry Standard Professional Engineer <br /> ❑ Other(Spec) <br /> Test Method Used: F] Pressure Fx-1 Vacuum ❑ Hydrostatic <br /> ❑ Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# 1-91 Spill Box# 2-87 Spill Box# Spill Box# <br /> Bucket Diameter: 11 11 <br /> Bucket Depth: 10 10 <br /> Wait time between applying <br /> pressure/vacuum/water and 1 MIN 1 MIN <br /> starting test: <br /> Test Start Time: 8:44 8:54 <br /> Initial Reading(RI ): 30 30 <br /> Test End Time: 8:4 5 8:55 <br /> Final Reading(RF ): 30 26.5 <br /> Test Duration: 1 MIN 1 min <br /> Change in Reading(R F -RI ) 0 3.5 <br /> Pass/Fail Threshold or 4" WC 4" WC <br /> Criteria: <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />