Laserfiche WebLink
RECEIVED <br /> DEC 16 2015 <br /> 5. SECONDARY PIPE TESTING ENVIRONMENTAL <br /> Test Method Developed By: El Piping Manufacturer ✓❑Industry Standard ElProfes i <br /> F]Other(Spec) <br /> Test Method Used: ✓❑Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: PSI <br /> Piping Run#87 Piping Run#91 Piping Run# Piping Run# <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith <br /> Piping Diameter: 3" 3" <br /> Length of Piping Run: Appx 175' Appx 175' <br /> Product Stored: 87 91 <br /> Method and location of Test Boot in Sump Test Boot in Sump Test Boot in Sump Test Boot in Sump <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 minutes 15 minutes 15 minutes <br /> starting test: <br /> Test Start Time: 10:13am 10:13am <br /> Initial Reading(Rj): 5 PSI 5 PSI PSI PSI <br /> Test End Time: 11:13am 11:13am <br /> Final Reading(RF): 15 PSI 5 PSI PSI PSI <br /> Test Duration: 1 hour 1 hour 1 hour 1 hour <br /> Change in Reading(RF-RI): 0 0 <br /> Pass/Fail Threshold or 0 0 0 0 <br /> Criteria: <br /> Test Result L ❑✓ Pass ❑Fail [Z]Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />